The Value of DEWA Approval: Promoting Sustainable and Safe Living in Dubai
Thank you for visiting our site, where we explore everything in Dubai! Today, we'll delve deeply into DEWA approval, a key component of life in this thriving metropolis. You've come to the correct spot if you're wondering what this is and why it's so crucial. DEWA clearance is crucial in determining how your experience as a resident of Dubai is shaped, from protecting your safety to encouraging sustainable living. So, grab a seat and come along as we explore the significance of DEWA accreditation and how it ensures sustainable and safe living in one of the most interesting locations on earth!
Overview of DEWA Approval
In Dubai, all new building projects must have DEWA approval. The procedure makes certain that all projects adhere to the highest standards of sustainability and safety. The project must be reinspected and authorized by DEWA once the first DEWA approval has expired, which is good for three years.
The Dubai Municipality requires DEWA Approval, which is acquired via an application procedure. The project's developer or contractor is needed to submit the application and all necessary paperwork. A DEWA official will assess the project on-site after receiving the application. A certificate of approval will be issued by DEWA if the project satisfies all conditions. This certificate must be available to workers on-site and posted at the construction site.
Describe DEWA
The integrated delivery of electricity and water services in Dubai is the responsibility of the Dubai Electricity and Water Authority (DEWA). DEWA is a publicly traded utility with the responsibility of offering consumers in Dubai water and power that is safe, dependable, and sustainable.
Due to the combination of the Dubai Electricity Department and the Dubai Water Department, DEWA was created in 1992. With its main office in Dubai, DEWA employs around 11,000 people.
The objective of DEWA is to "provide residents and businesses with dependable electricity and water services that contribute to making Dubai one of the best places to live and work." DEWA's ambition is "to become a world-leading sustainable utility."
DEWA has established various challenging goals in keeping with its vision, such as: - Obtaining 100% renewable energy by 2030 - Reducing carbon dioxide emissions by 30% by 2030.
- By 2030, 1 million electric vehicles will be connected to the grid.
DEWA has started several projects to meet these goals, including the Mohammed bin Rashid Solar Park and the Shams Dubai Solar Power Project.
What Makes DEWA Approval Required?
DEWA oversees ensuring that all water and energy suppliers in Dubai uphold strict standards of quality, safety, and sustainability. DEWA is the independent regulatory body for water and electricity in the Emirate of Dubai. Before work can start on any new developments in Dubai, DEWA clearance is necessary.
All new constructions must be planned and constructed in accordance with the highest standards of quality, safety, and sustainability, thanks to DEWA's approval procedure. This cover demands for renewable energy consumption, water conservation, and energy efficiency. In order to make sure all authorized developments continue to fulfill these high requirements; DEWA also conducts routine inspections of each one.
The Value of DEWA Approval: Promoting Sustainable and Safe Living in Dubai
The Various Steps to Obtaining a DEWA Approval
1. Applying to DEWA is the initial step. You may do this in person or online at a DEWA office.
2. DEWA will then review the application and could ask for more details.
3. DEWA will provide a permission letter following the conclusion of the evaluation.
4. When requesting building permission from the Dubai Municipality, the approval letter must be shown.
5. Construction can start after the building permit has been granted.
Factors to Consider Before Requesting a DEWA Approval
There are a few things to bear in mind while applying for DEWA approval to guarantee a simple and effective application process. The first thing to do is to make sure you have all the necessary papers, including your property title documents, construction permits, floor plans, site plans, and any other pertinent papers, on hand. To accurately complete and submit the required paperwork, you must first ensure that you are familiar with the DEWA approval procedure and requirements. Be prepared to pay the accompanying fees; DEWA approval is not free, and your application may be delayed or even denied if the necessary payments are not paid. Before applying for DEWA permission, you can assist assure a hassle-free process by following these easy steps and being ready.
Conclusion
Living in Dubai requires DEWA permission, which is also an excellent method to make sure your house is secure and environmentally friendly. The need for high-quality housing and effective services increases along with the population. By making sure all necessary precautions are taken when building or purchasing a property, you can feel confident knowing you're contributing to environmental protection while also giving yourself a high-quality and secure living environment, two factors that greatly contribute to the creation of fulfilling day-to-day experiences here in Dubai.
0 notes
selvagroup · 11 months
Text
How to Use DEWA's Electricity Connection Cost Calculator – A Step-by-Step Guide?
Are you a Dubai resident who wants to know how much it will cost to connect electricity in your new home or business? Look no further! DEWA's Electricity Connection Cost Calculator is here, and we've got a step-by-step guide on how to use this valuable tool. Don't let confusing calculations weigh you down - with our help, you'll soon be able to estimate the exact electricity connection costs for your property quickly and accurately. Get ready to master the art of estimating your bills with ease!
Introduction to DEWA's Electricity Connection Cost Calculator
If you're a new customer looking to get connected to the Dubai Electricity & Water Authority (DEWA) grid, one of the first things you'll need to do is use DEWA's Electricity Connection Cost Calculator. This tool will help you determine the estimated cost of your connection, based on several factors including the type of connection, voltage, demand, and more.
In this article, we'll walk you through how to use DEWA's Electricity Connection Cost Calculator so that you can get a better understanding of what your connection will cost. We'll also provide some tips on how to keep your costs down.
To use DEWA's Electricity Connection Cost Calculator, simply select the "new customer" option and enter your details. On the next page, select the type of connection you need - either low voltage or medium voltage - and enter the required information. Once you've done this, click on the "Calculate" button, and you'll be given an estimate for your connection.
Keep in mind that this is only an estimate - actual costs may vary depending on several factors such as final load requirements, cable routing, site conditions, and more. For a more accurate quote, contact DEWA directly.
How to Use the Cost Calculator?
If you're looking for a quick and easy way to estimate the cost of an electricity connection in Dubai, look no further than DEWA's Electricity Connection Cost Calculator. This online tool allows you to input your connection requirements and provides an estimated cost based on those specifications.
To use the calculator, simply enter your details into the required fields and click 'Calculate'. The calculator will provide you with an indicative cost for your electricity connection, which you can then use to compare quotes from different service providers.
Keep in mind that the calculator is only a guide – actual costs will vary depending on the specific requirements of your connection. For a more accurate estimate, it's always best to contact a professional electrician.
Step-by-Step Guide to Using DEWA’s Electricity Connection Cost Calculator
DEWA's Electricity Connection Cost Calculator is a great way to estimate the cost of connecting your home or business to the electricity grid. The calculator considers the type of connection, the voltage level, the number of phases, and the length of cable required. It also considers the environmental conditions at your location. Simply enter your address and DEWA will provide you with an estimated cost.
How the Cost Calculator Works?
The process for using DEWA's electricity connection cost calculator is simple. Just enter your information into the online form and submit it. After that, you'll receive an estimate of the cost to connect your home or business to DEWA's electricity grid.
DEWA's electricity connection cost calculator takes several factors into account, including the type of connection you need, the voltage you require, and the length of time you need the connection. All these factors will affect the final cost of your connection.
However, there are a few things that you can do to help reduce the cost of your connection. First, try to get multiple quotes from different contractors. This way, you can compare prices and make sure you're getting the best deal.
Second, make sure to get all the necessary permits and approvals before starting any work. This can save you both time and money in the long run.
Don't forget to factor in the cost of materials when calculating your total costs. This includes things like wire, conduit, fittings, and any other materials that will be required for your specific project. By taking all these factors into account, you can be sure that you're getting an accurate estimate of the cost to connect to DEWA's electricity grid.
What Information Is Required?
To use the DEWA electricity connection cost calculator, you will need to provide the following information:
1. The type of connection you require (e.g., single phase or three-phase)
2. The voltage you require (e.g., 240 volts or 400 volts)
3. The amperage you require (e.g., 16 amps or 32 amps)
4. The length of cable required (in meters)
5. The number of power sockets required
6. The number of light fittings required
7. The number of air-conditioning units required
8. Your DEWA account number (if applicable)
9. Your Emirates ID number
After you have provided all the required information, the DEWA electricity connection cost calculator will provide you with an estimated price for your connection charges.
Potential Problems When Using the Calculator
If you are not careful when using the calculator, you may end up with an inaccurate estimate of your connection costs. This can happen for several reasons, including:
1. You inputted the wrong information:
Make sure to double-check that you have entered the correct information before hitting calculate. Otherwise, you could end up with an incorrect estimate.
2. The calculator is outdated:
DEWA regularly updates the calculator, so be sure to use the most recent version to get the most accurate results.
3. The assumptions made by the calculator don't match your situation:
The calculator makes some assumptions about your situation (e.g., average electricity consumption), which may not be accurate in your case. Be sure to take this into account when interpreting your results.
4. The results are only estimates:
The calculator is not able to guarantee the exact cost of your connection, so it's important to bear in mind that your final bill could be higher or lower than indicated by the calculations.
Factors Considered When Computing the Estimate Costs
There are several factors that go into computing the estimated costs for an electricity connection. First, the DEWA Electricity Tariff will be applied to the total connected load. This is the price per unit of electricity that you will pay for using the connection. In addition, a Development Charge will be applied to new construction projects. This charge is based on the estimated cost of upgrading the infrastructure to accommodate the new development. A Connection Charge will be applied to all new connections. This charge covers the cost of making the actual connection to DEWA's electrical grid. All these charges will be added together to arrive at the estimated cost for your electricity connection.
Advantages of Using the Cost Calculator
The Cost Calculator is a great tool for ensuring that you get the most accurate estimate of the cost of your electricity connection. By inputting a few simple pieces of information, you can get an instant and accurate estimate of the cost. Additionally, the Cost Calculator is available online 24/7, so you can always get an up-to-date estimate.
Additional Tips for Saving Money on Connecting Your Home to DEWA's Networks
-If you are a new customer to DEWA, you will be required to pay a deposit as well as the connection fees. The deposit is refundable.
-You can save money on the total fees by applying for a social tariff. This is available to those who meet certain criteria, such as being registered with the Dubai Welfare Association.
-You may also be able to get a discount on the connection fees if you are connecting more than one property at the same time.
Conclusion
Using DEWA's electricity connection cost calculator is an easy and intuitive way to calculate the cost of connecting an electrical supply. With it, you can quickly estimate your costs in just a few simple steps without any hassle. Whether you are planning a small renovation or a large construction project, this calculator can save you time and money by providing accurate estimates that will help you stay on budget. DEWA's electricity connection cost calculator is free for all customers and provides valuable information to those looking for reliable estimates of their electricity connection costs.
0 notes
selvagroup · 11 months
Text
A Guide to DEWA Generation Projects Document Submission
Are you planning on submitting a DEWA Generation Projects Document, but don't know where to start? Look no further because this guide has got you covered! With its quick and easy breakdown of the document submission process, your DEWA project will be up and running in no time. So, whether you're a seasoned pro or just starting out, let's dive in and get your proposals submitted with ease!
Introduction to DEWA Generation Projects Document Submission
DEWA has introduced a new online platform for the submission of generation project documents. The new platform is designed to streamline the submission process and provide a more user-friendly experience.
Documentation required for the generation project submission includes:
Application Form
An application form must be completed and submitted online.
Project Proposal
A proposal outlining the proposed project must be submitted. This document should include an overview of the project, expected outcomes, and budget information.
Site Plans
Detailed site plans indicating the location of the proposed project must be submitted.
Technical Specifications
Technical specifications for the proposed project must be submitted. This document should include information on capacity, fuel type, emissions, and other relevant technical details.
Who Can Submit Projects Documents?
Project documents can be submitted by any entity, whether an individual, company, or government body, that is interested in carrying out a generation project within the Emirate of Dubai. The project document submission must include all the required information and meet DEWA’s standards to be considered for review.
Types of Documents Needed for Submission
There are many different types of documents that may be required for submission to obtain a DEWA generation project approval. Some of the most common include:
1. Business Plan
A detailed business plan is often required to provide an overview of the proposed project, including its financial feasibility and potential market demand.
2. Technical Report
A technical report is generally required to assess the technical viability of the proposed project and its compliance with DEWA regulations.
3. Environmental Impact Assessment
An environmental impact assessment may be required to evaluate the potential impact of the project on the surrounding environment.
4. Health and Safety Plan
A health and safety plan are often required to ensure that the project will be carried out in a safe and secure manner.
5. Economic Evaluation
An economic evaluation may be required to assess the financial viability of the proposed project and its potential economic benefits for Dubai.
Documents Required for The Process
All Dubai Electricity and Water Authority (DEWA) generation projects are required the submission of certain documents to be approved. This guide will outline what documents required for each type of project.
For large-scale projects, a pre-feasibility study must first be conducted to assess the technical and economic viability of the project. This study must be submitted to DEWA along with the following additional documents:
1. A feasibility study
2. An outline of the proposed project's financing
3. A copy of the land lease agreement or proof of ownership
4. The project's power purchase agreement
5. The project's water purchase agreement
6. An environmental impact assessment report
7. Proof of all necessary permits and approvals from relevant authorities
8. A list of all shareholders involved in the project
9. The curriculum vitae of the project manager and key personnel
10. A detailed project plan, including a timeline and budget
11. Any other relevant documents as required by DEWA
For small-scale projects, less than 10 MW, the documents above will need to be supplemented with an additional project proposal which includes:
1. The project's scope and objectives
2. The basic design of the proposed project
3. A financial analysis of the project's economic feasibility
4. An estimate of the expected fuel costs for the duration of the project
5. The specifications of any equipment to be used in the project
6. Anticipated timelines for all key milestones related to construction and commissioning
7. An analysis of available land resources and proof thereof
8. An estimation for any necessary permits that may be required 
9. Plans for any additional infrastructure that may have to be built or invested in for the project
10. And finally, an assessment of expected environmental impacts due to the project's development and operations.
Step-By-Step Guide
"DEWA Generation Projects Document Submission: A Step-by-Step Guide"
The Dubai Electricity and Water Authority (DEWA) is responsible for the generation, transmission, and distribution of electricity and water in the Emirate of Dubai. DEWA has several requirements for the submission of documents for any new-generation project. This guide outlines the document submission process step by step to ensure your project meets all the necessary requirements.
1. The first step is to submit a Letter of Intent (LOI) which includes information about the proposed project. DEWA will review the LOI and provide feedback within 30 days.
2. Once the LOI is approved, an Application Form must be completed and submitted along with a Non-Objection Certificate (NOC) from the project site owner/operator.
3. Upon review of the application form and NOC, DEWA may request additional information or documents. Once all required information has been received, DEWA will provide a Letter of Offer (LOO).
4. The LOO outlines the terms and conditions of connection to DEWA’s grid, including any fees that are applicable. Once accepted, a Power Purchase Agreement (PPA) will be issued, which must be signed by both parties within 60 days.
5. Upon signing the PPA, DEWA will provide technical specifications for the connection of the project to its grid. The developer must then appoint an accredited consultant to design the electrical connection and oversee construction.
6. Once the design is complete, an Application for Connections must be submitted to DEWA with all necessary supporting documents, such as drawings and calculations.
7. DEWA will review the application and provide feedback within 30 days. If approved, a Connection Agreement will be drafted and must be signed by both parties.
8. Upon signing the Connection Agreement, DEWA will put into effect Technical Terms and Conditions which include instructions on how to install the generation plant’s meters and other equipment in accordance with applicable health, safety, environment, quality assurance, and security requirements.
9. Once installation is complete, project performance tests must be conducted according to DEWA standards, and instructions are given by its technicians during site visits or in writing.
10. When all documentation has been accepted by DEWA, a formal acceptance certificate will be issued, allowing the operation of the generation plant in line with the terms of the PPA (Power Purchase Agreement).
How to Submit Project Documents to DEWA?
DEWA has a specific process for the submission of project documents. Below is a step-by-step guide on how to submit your documents:
1. Log in to the DEWA website and navigate to the Project Document Submission page.
2. Select the type of document you wish to submit from the list provided.
3. Enter the requested information into the online form. This will include your contact details, project name, and location, as well as a description of the document being submitted.
4. Upload the relevant document(s) onto the website. Supported file formats include PDF, Word, Excel, and PowerPoint.
5. Once all required information has been entered, click on the Submit button to send your documents to DEWA for review and approval.
Benefits
To ensure the timely and efficient review of your DEWA generation project documents, it is important to submit all required documentation in a complete and organized manner. The benefits of submitting complete and accurate project documents include:
- Reduced processing time for your application
- Fewer requests for additional information or clarification
- A more efficient and streamlined review process
- Increased likelihood of obtaining approvals in a timely manner
Why Is It Important?
There are several reasons why it is important to submit project documents to DEWA. First, DEWA is responsible for approving all generation projects in Dubai. By submitting your documents, you are ensuring that your project meets all the necessary requirements and will be approved by DEWA. Second, submitting your documents also allows DEWA to keep track of all the different projects taking place in Dubai and helps them allocate resources accordingly. By submitting your documents, you are also helping to ensure the smooth and efficient running of Dubai's power grid.
Conclusion
We hope this guide to DEWA Generation Projects Document Submission has been helpful and that you have a better understanding of how the document submission process works. With all the paperwork required, it can be overwhelming, but with some patience and guidance like our detailed guide here today, you should be able to submit your documents without any issues in no time at all. Good luck!
0 notes
selvagroup · 11 months
Text
Why Obtaining Electricity Fit-Out Connections from DEWA is Vital for Your Business?
Do you intend to establish a new company in Dubai or grow an existing one? If so, your main priority should be obtaining DEWA electricity fit-out connections. Having a dependable and effective electrical connection may make all the difference in today's environment when an uninterrupted power supply is essential for operating any business efficiently. Let's examine the importance of obtaining power fit-out connections from DEWA for your company and how doing so may help you in the long term.
Obtaining DEWA's electricity fit-out connections
The Dubai Electricity and Water Authority (DEWA) must provide power fit-out connections if you intend to open a new company in Dubai. The business DEWA, which is controlled by the government, oversees the offering of water and electrical services in Dubai.
Low voltage (LV) and high voltage (HV) power services are both available in Dubai. While HV connections are for big commercial and in clients; clients, LV connections are for residential and small business users.
To assist companies in connecting to the main power supply, DEWA provides several services. This includes offering technical assistance during the installation process and assisting businesses with obtaining the required permissions and licenses.
DEWA also provides a variety of continuous support services, such as energy efficiency guidance, to assist companies in lowering their energy usage and bill payments.
Benefits
There are several advantages to connecting your company to DEWA because it is the top supplier of electrical fit-out connections in Dubai. Here are a few of the main advantages:
1. DEWA has a solid reputation for providing high-quality service and is a dependable and trustworthy source of power.
2. DEWA's extensive network of electrical connection points makes it simple to connect your company to the grid across Dubai.
3. DEWA is a cheap alternative for businesses since it offers competitive pricing for electrical fit-out connections.
4. DEWA provides a variety of value-added services, such as support with government incentive applications and advice on energy saving.
5. DEWA is dedicated to preserving the environment and provides green energy choices for companies who wish to lessen their carbon footprint.
DEWA Fit-Out Connection Types
Depending on the requirements of your company and its size, you may select between three different DEWA fit-out connections:
Low Voltage Connection (LV)
Small enterprises that use little power should use this. 90 kilowatts (kW) is the maximum demand for this kind of connection.
Medium Voltage (MV) Connection:
This is perfect for companies that use a lot of power. One thousand kW is the maximum demand for this connection type.
High Voltage (HV) Connection:
This is ideal for big companies with a lot of power use. The highest possible demand for this connection type is 5,000 kW.
You will need to choose which kind of DEWA fit-out connection is most appropriate for your needs based on the size of your business.
Process
The only source of energy and water in the Emirate of Dubai is the Dubai Electricity and Water Authority (DEWA). Customers of DEWA can choose from a variety of services, including connections for new enterprises' fit-outs.
The following steps must be followed in order to receive electrical fit-out connections from DEWA:
1. Customers must first submit the form to DEWA along with the necessary paperwork.
2. DEWA will give the client a quote for the connection fees when the application has been examined and accepted.
3. Following the customer's payment of the connection costs to DEWA, work on the connection will start.
4. DEWA will give the consumer an occupancy certificate when the connection is complete.
Required Documents
You must apply for an electricity fit-out connection with the Dubai Electricity and Water Authority (DEWA) if you want to start a new company in Dubai. Since DEWA oversees providing energy to every business in Dubai, this is a crucial step in getting your enterprise up and operating.
You must provide the following paperwork to apply for a fit-out connection:
Form of Application:
This is available for download from the DEWA website.
Intent letter:
This should include a statement about your desire to make an application for a fit-out connection and be submitted with your application form.
Plot Assignment Letter:
This document, which you should get from the Dubai Land Department, should attest to the fact that you have been given a parcel of land on which to construct your company.
Building Permit:
This document, which you should receive from the Dubai Municipality, will attest to the approval of your building designs.
Authority Letter:
This letter, which you should get from your free zone authority or sponsor, will attest to their approval of your application to open a company in Dubai.
Bank Statement:
This document, which you should receive from your bank, will demonstrate that you have the money necessary to start a new company in Dubai.
Photographs of the Site:
For DEWA to evaluate your needs for a fit-out connection, you need to provide them with at least 5 photographs of the site.
With this information, we want to assist you in contacting DEWA to request a fit-out connection. Please contact us if you require any more help.
How Can Cost Savings Be Maximized?
Getting power fit-out connections from DEWA has various advantages, including cost savings. Using DEWA's power fit-out connections can help you save money in the following ways:
1. Begin by carefully planning your project and submitting your connection request at least 60 days before you require power. This will prevent any last-minute rush fees and ensure a quick and easy transaction.
2. If you are doing a significant remodeling or construction project, think about requesting a temporary suspension of service rather than scheduling the work during peak hours. Both the connection cost and the power usage charge may be reduced as a result.
3. To ensure that DEWA can provide you with an accurate price, be sure to include all necessary information and documentation when completing your application. This will help prevent any unforeseen fees in the future.
4. After you have your price, thoroughly check it to make sure all the expenses are disclosed and there are no unforeseen charges. Please feel free to ask DEWA customer care for more details if you have any.
5. Pay special attention to the deadline for finishing the assignment. Electricians frequently try to charge consumers more by extending the deadline without a good reason. If you think the deadline is arbitrary, haggle with the electrician or, if required, ask DEWA for an extension.
You may maximize cost savings through DEWA's power fit-out connections by using these suggestions.
Different Options for Payment
For electrical fit-out connections, DEWA provides a variety of payment alternatives. These include credit/debit cards, e-Dirham cards, and post-dated checks.
Both one-time and recurring payments can be made with post-date checks. You can make one-time payments or regular payments using e-Dirham cards. You can make one-time payments or regular payments using credit/debit cards.
DEWA guidelines and norms
Because DEWA policies and regulations control how structures are linked to the power grid, they are crucial for enterprises operating in Dubai. All industrial and commercial structures are required to be wired into the DEWA electrical grid, and these connections are subject to stringent guidelines.
Disconnection from the energy grid is one of the serious penalties for breaking DEWA's laws and regulations. Before beginning any maintenance on the electrical system of your building, it is crucial to ensure that you understand the DEWA laws and regulations because this can seriously disrupt companies.
Before starting any work on the electrical system of your building, it is necessary to familiarize yourself with DEWA's laws and regulations, since they are intended to safeguard both consumers and companies. You can stay connected to the electrical grid and prevent any issues by being aware of the DEWA laws and regulations.
Conclusion
In conclusion, DEWA becomes the ideal fit-out partner for companies in Dubai. In addition to offering quick connections that will save you time and money, it also delivers a secure, dependable, and environmentally friendly electrical source for your company. In addition, its helpful customer support staff is always available to assist with any questions or problems you might have with your connection. Make sure to make a sensible option when investing in a fit-out connection from DEWA because it might be one of the most important ones when launching a business.
0 notes
selvagroup · 1 year
Text
What Documents Do You Need to Get a Water Connection from DEWA?
Tumblr media
Are you in the process of planning your move to Dubai, or simply looking to get a water connection from DEWA? In either case, it's important that you have all the necessary documents to facilitate a smooth and hassle-free experience. This comprehensive checklist will provide you with everything you need to know about getting a water connection from DEWA - so keep reading!
Introduction to DEWA and Water Connections
DEWA is the Dubai Electricity and Water Authority, and it is responsible for providing water and electricity to Dubai. If you're looking to get a water connection from DEWA, there are a few things you need to know.
First, you'll need to have your property inspected by DEWA to obtain a water connection. This inspection will ensure that your property meets DEWA's standards for water connections.
Once your property has been inspected and approved, you'll need to apply for a water connection. This application can be submitted online or in person at a DEWA office.
When submitting your application, you'll need to provide proof of ownership of the property, as well as a valid Emirates ID. You'll also need to pay the application fee, which is currently AED 200.
Once your application has been approved, DEWA will issue you a water connection permit. This permit must be prominently displayed on your property so that DEWA inspectors can find it easily.
You'll need to contact a licensed contractor to connect your property to the public water network. The contractor will need the water connection permit to do this work.
The Documents Required for a Water Connection from DEWA
1. Emirates ID.
2. Tenancy contract.
3. No objection certificate from the developer or landlord (for villas and apartments).
4. Title deed (for villas only).
5. Passport-size photograph.
6. Application form, which is available at any DEWA customer Happiness Centre or can be downloaded from the DEWA website.
7. Connection fees.
- Emirates ID
An Emirates ID is required for all residents of the UAE, regardless of nationality. The card is obtained from the Emirates Identity Authority and serves as both an identification document and a residency permit. All applications for water service from DEWA must be accompanied by a valid Emirates ID.
- Proof of Address in Dubai
If you're a resident of Dubai, you'll need to provide a few documents to DEWA in order to get a water connection. These include:
-Your passport or Emirates ID.
-A utility bill or tenancy contract in your name.
-Proof of address in Dubai.
-A No Objection Certificate (NOC) from your developer or landlord (if applicable).
Once you have all these documents, you can apply for a water connection through DEWA's website.
- Tenancy Contract
A tenancy contract is a document that outlines the terms of a lease agreement between a landlord and tenant. It includes information such as the length of the lease, the monthly rent amount, and any conditions or restrictions on the use of the property. The contract must be signed by both parties to be valid.
- NOC from Building Owner/Manager
To get a water connection from the Dubai Electricity and Water Authority (DEWA), you will need to obtain a No Objection Certificate (NOC) from the building owner or manager.
The process for obtaining a NOC from the building owner or manager varies depending on the policies of the specific building. However, most buildings will require you to submit a request in writing, along with any supporting documents.
Once your request is received, the building owner or manager will review it and decide. If they decide to issue an NOC, they will sign and date it, and return it to you.
If you have any questions about obtaining a NOC from the building owner or manager, DEWA customer service representatives are available 24/7 to assist you.
- Copy of Ministry of Electricity and Water Registration Number (MERA)
To obtain a water connection from DEWA, you will need to provide a copy of your Ministry of Electricity and Water (MERA) registration number. This number can be obtained from your local MERA office or by contacting the Dubai Electricity and Water Authority directly.
If you are already a customer of DEWA, your MERA registration number can be found on your monthly bills from DEWA.
- Authorization Letter (if Applicable)
If you are not the owner of the property or if you are not authorized by the owner to apply for a water connection, then you will need to submit an authorization letter along with your application. The authorization letter must be on the letterhead of the company or organization, and it must be signed by a representative of the company or organization.
- Connection Fees
There are a few different fees associated with getting a water connection from DEWA. The first is the application fee, which is AED 100. This is a one-time fee that covers the cost of your application being processed. The second fee is the connection fee, which is AED 1000. This is a one-time fee that covers the cost of connecting your property to DEWA's water network. The third and final fee is the monthly service charge, which is AED 30. This is a recurring fee that covers the cost of your water being delivered to your property each month.
Application/Permission for a New Connection
To apply for a new water connection from DEWA, you will need to submit a completed application form along with the required documents. These documents include:
– A copy of your Emirates ID or passport.
– A copy of your tenancy agreement or property ownership title deed.
– Two passport-sized photographs.
– A bank guarantee or deposit payment as specified by DEWA.
Once your application and documents have been submitted, DEWA will review your request and determine if you are eligible for a new water connection. If approved, you will be issued a permission letter which must be presented to the contractor completing the installation.
System Design/Plot Plan
Dubai is a rapidly growing city and with that, its infrastructure is constantly evolving. One of the most important utilities in any building is a water connection. In Dubai, this is provided by the Dubai Electricity and Water Authority (DEWA).
If you're planning to get a water connection for your property, there are certain documents that you'll need to submit to DEWA. These include:
- Copy of title deed or lease agreement.
- Plot plan indicating the location of the water connection point.
- Two recent passport-sized photographs of the applicant.
- DEWA application form.
Once you have all the required documents, you can submit them either online or at any DEWA customer service center. Once your application has been processed, DEWA will provide you with a water connection within 21 days.
Illustrative Drawings
If you're planning on getting a water connection from Dubai Electricity and Water Authority (DEWA), you'll need to make sure you have all the required documents in order. This comprehensive checklist will ensure that you have everything you need to get your water connection up and running smoothly.
To apply for a water connection, you will need:
-A valid Emirates ID.
-Your Tenancy Contract or Title Deed.
-An application form that can be obtained from any DEWA Customer Happiness Centre or downloaded from DEWA’s website.
-An active DEWA electricity account in your name.
-The location of the water connection within the property.
-The type of connection required (e.g., domestic, commercial, industrial).
-The plot sizes.
In addition to the above documents, you will also need to provide two sets of Illustrative Drawings for your water connection application. These drawings must be stamped and signed by a licensed architect or engineer and must include the following information:
-The location of the property/ies on the site plan.
-The location(s) where water is required inside the property/ies.
-All existing internal and external pipework within the property/ies.
If you are unsure of how to prepare these drawings, DEWA offers a service where they can provide you with stamped and signed illustrations for an additional fee.
Buildings Technical Specification/Fire NOC
The Buildings Technical Specifications/Fire NOC is one of the documents you need to get a water connection from DEWA (Dubai Electricity and Water Authority). The purpose of this document is to ensure that the proposed building meets all the technical specifications and fire safety requirements set by DEWA.
DEWA has very specific requirements for buildings that want to connect to its water supply. These requirements are outlined in the Building's Technical Specifications/Fire NOC document. Some of the key points covered in this document include:
The building must be designed and constructed in accordance with the Dubai Civil Défense General Fire Code.
The building must have an automatic fire sprinkler system installed that meets DEWA's specifications.
The building must have a fire alarm system installed that meets DEWA's specifications.
The building must have a water tank that meets DEWA's specifications.
The building must have a backflow prevention device installed that meets DEWA's specifications.
Tips on DIY Application Process
The Dubai Electricity and Water Authority (DEWA) is the only utility provider in the emirate of Dubai. So, when you want to get a water connection for your home or office, you will need to go through them. Here are some tips on the application process:
1. The first step is to fill out an online application form on DEWA's website. This form requires basic information about yourself and your property, such as your contact details and the address of the property.
2. Once you have submitted the form, DEWA will send you a confirmation email with your application number. Keep this number handy as you will need it for future reference.
3. Within 10 working days, DEWA will send an inspector to your property to assess the water connection requirements. The inspector will also look at your property's internal plumbing and make sure that it meets DEWA's standards.
4. After the inspection, DEWA will provide you with a quotation for the water connection charges. These charges vary depending on the size and type of connection required.
5. Once you have accepted the quotation, DEWA will process your application and provide you with a connection within 4-6 weeks.
Conclusion
Getting a water connection from DEWA can be an intimidating task, as there are many documents and steps that need to be taken care of. But with this checklist by your side, you can feel confident knowing that every document requirement has been thought of and taken care of to ensure the process goes as smoothly as possible. So, take advantage of this comprehensive document list today and go ahead, confidently get your first water connection with DEWA!
1 note · View note