Tumgik
#refractory is nil
brewed-pangolin · 3 months
Text
Soap MacTavish's refractory period is basically nonexistent. 30 seconds to 5 minutes max.
Man will literally bounce off the bed, leaving you splayed out and trying to remember how to breathe while he trots over to the kitchen to grab himself a Gatorade and a protein bar.
You're still in the grips of having an existential crisis when he emerges back into the bedroom.
And this mother fucker has the audacity to ask if 'you're okay.'
To which you answer by blinking. That's it.
"Aw, poor lass. Let's teach ya thing er two bout endurance, yeah?"
And then he starts all over again.
He does two circuits of this. And by the end, you don't know whether you're on the brink of death or being reborn into another plain of existence.
1K notes · View notes
burtsherwood · 1 year
Text
Twin Three dimensional DNA Nanomachine-Mediated Catalytic Hairpin Assembly regarding Ultrasensitive Recognition of MicroRNA.
Power spending and the body make up have been tested by simply oblique calorimetry and also permanent magnetic resonance image, correspondingly. Bone muscle insulin-stimulated sugar usage has been calculated ex lover vivo in soleus as well as extensor digitorum longus muscle groups employing a 2-deoxyglucose uptake approach using a physiological insulin shots power of 360 pmol/l (60 mu U/ml). Sirt1 mRNA as well as SIRT1 health proteins amounts were elevated by simply around 100- as well as 150-fold, correspondingly, in bone muscles regarding rodents along with SIRT1 overexpression in comparison with wild-type rats. Despite this large-scale overexpression of SIRT1, body arrangement, whole-body vitality costs https://www.selleckchem.com/products/smoothened-agonist-sag-hcl.html , substrate corrosion and also non-reflex exercise were equivalent among genotypes. In the same manner, skeletal muscles basal as well as insulin-stimulated carbs and glucose uptake were unaltered along with SIRT1 overexpression. Last but not least, while Twenty era of vitality restriction increased insulin-stimulated carbs and glucose subscriber base in bone muscle groups of wild-type rats, simply no further effect of SIRT1 overexpression has been observed. These outcomes show upregulation associated with SIRT1 activity inside skeletal muscles has no effect on whole-body energy costs or even improve skeletal muscles insulin shots level of sensitivity within small these animals on a common diet plan together with free usage of chow or perhaps in small#keep##links# rodents about energy-restricted eating plans.Purpose: Despite the fact that resection of an epileptogenic region remains to be the principal operation of epilepsy surgical procedure, epileptogenic locations throughout functionally essential cortex can't be approached in this method. The disease electro-coagulation on well-designed cortex (BCFC) was made to treat such refractory seizures with no leading to unacceptable neural failures. Take a look at document the outcome with this treatment#keep##links#. Methods: 20 patients that experienced real BCFC with out resection between 2002 along with 08 ended up retrospectively examined with regard to seizure result, postoperative difficulties, as well as predictive factors. This study offers valuable information with regard to policy makers to improve put together nearby replies to deal with the effect involving hot conditions about human population wellness.Inside Ultraviolet nanoimprint, UV-curable liquid plastic resin is often offered since droplets, nevertheless, from the viewpoint regarding throughput, it's not at all a great venue in some instances. Once the pattern denseness of an given layout can be considered uniform, UV-curable liquid plastic resin ought to be offered being a film which has a uniform breadth in case hardly any other vital troubles take place. Okay line-and-space (L/S) styles with sizes#keep##links# involving Forty-five, Over 60, and 90nm ended up successfully created with a continuing covering width associated with 20nm through UV-NIL inside pentafluoropropane (PFP) using a rewrite layer UV-curable plastic resin, PAK-01, along with the throughput regarding UV-NIL inside PFP for that fabrication of such good L/S habits with a slender residual level was looked at. The particular glue filling up involving UV-NIL throughout atmosphere wasn't completed in 15 utes but that regarding UV-NIL in PFP had been carried out 0.
0 notes
commander-diomika · 3 years
Note
Rusty Quill Gaming for the ask meme!
Push off a cliff - It's funny, RQG isn't rife with villains worth a lot of ire, but I'm gonna go with Saleh Senior, Hamid's dad, for just generally being a trainwreck of a father.
Frick frack - Toss up between Cel and Grizzop. You know that Cel knows how to make it good for just about anyone, and whilst Grizzop wouldn't be much for foreplay I'm willing to bet he's got a refractory period of basically nil.
Marry - Ed (himbo rights) or Azu.
Set on fire - OH I just remembered that there IS character I wish ill on, and that character is Gideon. I wouldn't set him on fire, I'd have Hamid do it.
Wrap a blanket around - Oh Wilde. He's so far from fine.
Be roommates with - Zolf. He's a depressed bastard who mostly keeps to himself and knows how to cook, which honestly sounds like a perfect match for me. Ancient Ask Meme
9 notes · View notes
ltsharif · 5 years
Video
youtube
(via Keep your duty to Allah)   Quran Chapter 26: 123 to 127 (Pt-19, Stg-5) (L-2342) درس قرآن Keep your duty to Allah Chapter “Shu-‘araaa’”- (The Poets) – 26 ‘A-‘uu-zu  Billaahi minash-Shay-taanir- Rajiim. (I seek refuge in Allaah from Satan the outcast) Bis-Millaahir-Rah-maanir-Rahiim.(In the name of Allaah, the Beneficent, the Merciful)                                                           كَذَّبَتْ عَادٌ ٱلْمُرْسَلِينَ 123  إِذْ قَالَ لَهُمْ أَخُوهُمْ هُودٌ أَلَا تَتَّقُونَ 124  إِنِّى لَكُمْ رَسُولٌ أَمِينٌ 125  فَٱتَّقُوا۟ ٱللَّهَ وَأَطِيعُونِ 126  وَمَآ أَسْـَٔلُكُمْ عَلَيْهِ مِنْ أَجْرٍ إِنْ أَجْرِىَ إِلَّا عَلَىٰ رَبِّ ٱلْعَٰلَمِينَ 127 123.  (The tribe of) ‘Aad denied the messengers (of Allah). 124.  When their brother Huud said unto them: Will ye not ward off (evil)? 125.  Lo! I am a faithful messenger unto you – 126.  So keep your duty to Allah and obey me. 127.  And I ask of you no wage therefor; my wage is the concern only of the Lord of the Worlds. 123.  Kazzabat  ‘Aadu-nil- mursaliin. 124.  ‘Iz  qaala  lahum  ‘akhuu-hum  Huudun  ‘alaa  tattaquun. 125.  ‘Innii  lakum  rasuulun  ‘amiin. 126.  FattaqUllaaha  wa  ‘atii-‘uun. 127.  Wa  maaa  ‘as-‘alukum  ‘alayhi  min  ‘ajr.  ‘In  ‘ajriya  ‘il-laa  ‘alaa  Rabbil-  ‘Aalamiin. Commentary After the water-storm of Noah (peace be upon him), the world became full of population again by those people, animals and birds, who were saved from drowning by embarking on the ship. Some period passed in peace, but when the population increased and the people spread here and there, then every person began to do according to own will. From them; there was a group of people which was called the tribe of ‘Aad. Their refractoriness increased more than enough. There people were very healthy, strong, stout and active. Their Country was fertile, so there was no deficiency of wealth. Ultimately they also were involved in evil deeds being proud, which destroy the mankind. After that, when the oppression of the oppressors increased very much on the oppressed people, they gave up doing useful works and began to do useless works for the sake of fame and renown, then Allaah Almighty appointed Huud (peace be upon him) as His Prophet and sent towards them because he belonged to the same folk (of ‘Aad). At first, he (peace be upon him) conveyed the same Message which is delivered by all Prophets (peace be upon them) usually, that is to say: Keep your duty to Allaah Almighty, I am His trustworthy Messenger and say only that to you which is better for you. So you should obey me. I do not demand wage, wealth or property from you. But I cause to understand you only by the Command of Allaah Almighty. My wage is the concern only of Him Who is the Lord of the Worlds. Transliterated Holy Qur’aan in Roman Script & Translated from Arabic to English by Marmaduke Pickthall, Published by Paak Company, 17-Urdu Bazaar, Lahore, Lesson collected from Dars e Qur’aan published By Idara Islaah wa Tableegh, Lahore (translated Urdu to English by Muhammad Sharif). https://muhammadsharif120.wordpress.com/2019/10/15/keep-your-duty-to-allah-2/
0 notes
cloverincinerator · 7 years
Photo
Tumblr media
www.chinaclover.net has been published on http://www.chinaclover.net/two-combustion-chambers-type-incinerator/
Two combustion chambers type incinerator
Load Capacity minimum:  1500 kg Burner fuel type:  Diesel Burner fuel rate max.:   20-25 Liter diesel/ per hour Burners minimum: 3 Burning rate minimum: 200-300kg/per hour Furnace bar area minimum: 2 м3 Fuel tank capacity minimum: 300L Main chamber burning temperature min. 1100 0C Afterburner chamber burning temperature min.  1300 0C Power supply 220V Incinerator items and electrical appliances should be weather proof and humidity resistant within the range of 30-90 % Incinerator should be compliant to the environmental protection rules in accordance to national legislation Maximum dimensions – Length – 5m, width – 3.5m, height – 5m.Medical and Biological wastage. 3.1              Main unit 3.1.1 Application      For incineration, general and pathological 3.1.2                                            Capacity       100 – 120 kg/h burn rate 3.1.3 Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit 3.1.4         Operating time                   Minimum 8 hours daily 3.1.5          Operating temperature        From 850 0C to 1200 0C, Automatic controlled 3.1.6          Residual Ash                       5 to 10% 3.2     Primary Chamber 3.2.1 Construction    Constructed from heavy duty mild or aluminized  steel Or equal and approved equivalent 3.2.2 Insulation material               Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickwork 3.2.3 Internal Construction           Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material 3.2.4 Charging Door                      Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges. 3.2.5          Door Lock                             Automatic, Electric type 3.2.6 Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber 3.2.7                                    Gratings       Provided 3.2.8                                            Loading    Manual loading of waste 3.2.9           Primary Burner                           Fully automatic, with fuel, temperature and speed  controls with ignition system  flame detector                                                         Air fan Complete with safety features, flame failure                                                                    Diesel fired fuel injector type Flange mounted 3.2.10    Blower      Provided.  3 phase for supplying excess combustion air through the distribution system with speed control system 3.2.11    Temperature    Minimum exit 850 0C 3.2.12                               Observation port    To be provided with protective glass type 3.3    Secondary chamber 3.3.1 Construction    Constructed from heavy duty mild or aluminized steel or equal and approved equivalent 3.3.2                                            Insulation    Refractory material lining 3.3.3             Combustion Temperatures      Above 850 0C, controlled electronically 3.3.4             Gas residue or retention time                                              > 2 second at minimum 850 0C 3.3.5    Secondary Burner    Provided, Diesel fired, Fully automatic, with fuel, temperature and speed controls With ignition system Flame detector Air fan Complete with safety features, flame failure Diesel fired fuel injector type Flange mounted 3.3.6    Ejector    Provided, Venturi type, for cooling the flue gases 3.3.7 Combustion Air Fan                      Provided for supplying combustion and creating a negative drift and turbulences with variable speed control 3.3.8                                         Temperature    Maximum  1600 0C 3.4       Chimney 3.4.1 Construction    Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent Refractory material lining 3.4.2                                                    Length    10 m above ground 3.4.3                                                        Bore    about 350mm diameter 3.4.4            Discharge temperatures             About 850 0C 3.4.5                                            Emissions    To comply with standards in section 9 of third schedule of the waste management regulations, 2006. 3.5       Electrical System 3.5.1    Control unit                                           Fully automatic with microprocessor based control unit (PLC) automating all operations of the incinerator Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress Parameters  i.e. temperature of primary and second chambers , turbulence and time With status lamp With user of defined and differed programmed operating cycles for different type of loads/conditions With safety interlocks, display of errors and visible and audio alarms. System for continuous  emission monitoring 3.5.2    Isolator switch                                  Supply and install isolator switch 100A, 3 phase, 415V, 50Hz, for the incinerator unit , including all necessary cables 10m 3.5.3 Distribution Board           Supply and install distribution board 100 A, 3 phase 415V, 50Hz, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations. 3.5.4 Wiring       Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room. Working length 20m. Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations 3.6    Fuel System 3.6.1          Fuel Tank                                            Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor) Tank capacity, 500 liters, constructed from preferable suitable metallic material or high temperature resistance material Fuel type    Diesel 3.6.2 Fuel Lines                                       Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.  Working length , 20m Fuel pipe material    Special copper pipes or similar and approved materials 4. Physical characteristics 4.1              Main unit                                           Floor mounted, stand alone, fixed hearth type Dimensions    About 2.5 x 2.8m (WxD) 5.  Operating environment 5.1              Power Requirements                      415V, A/C 50Hz, Three phase, with PE Ambient temperature                     10 0C to 40 0C Relatively humidity                          40% to 90% 6             Accessories 6.1             Rack, 2 m long                               1 piece Waste cart, stainless steel               1 piece 7. Spare parts 7.1                                                      Burner        1 set 7.2              Fuel Filters                                         6 sets 7.3 All other spare parts                 required for replacement during and after 12 months of operations.    2 pieces of each 8              Quality Standards 8.2 Manufacturing standards               Environmental Management and Coordination Act, 1999 Legal Notice No.121 of 29th September 1999 on                                                                         waste Management Regulations EU waste incinerator Directive- EC 76/2000 BS 3316 WHO Emission Standards World Bank Emission Standards or any other internationally recognized standards Conformity to standards                      CE marked or any other internationally recognized documents 9          Local back up service 9.1                                                         Available    Should be available locally 9.2           Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator 10       Delivery point 10.1                                                        KEMSA    For inspection and verification 10.2 Moi Voi, Makindu Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning 11    Pre installation works Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards 12    Installation and testing    Complete installation and setup of the incinerator at designated as per manufacturer’s instructions Provide fuel and test run the incinerator for 3 hours daily for 7 days 13            Training 13.1 User training                                           On site user training on operation and daily up keep 13.2 Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting 14    Technical Documentations 14.1         User manuals                                          2 sets 14.2         Service manuals                                     2 sets 14.3                                                     Drawings    2 sets 15        Commissioning 15.1    Testing and Commissioning of the machine to the satisfaction of the user 16    Warranty 16.1                                                  Equipment      Minimum of one year after commissioning on all parts. 16.2       Equipment system                                     Nil 17.    Maintenance contract 17.2         Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning
Capacity per day around 8-10 kg wastage/day.·         Which product do you offer, only incinerator or also compactor, shredder machine, any other equipment related to waste treatment ?
·         For the incinerator, can you propose (and of so please send us specs and price) incinerator for 25 kg/hr, 50 Kg / hr, 100 kg / hr, 200 kg / hr ? what is your minimum and maximum size available ?
·         As we are not so experience in incineration process, can you tell us which type of waste can go into the incinerator and still respecting international environmental regulation ?
·         Do you equipped your incinerator with filters ? if so which one and they are following which standard ?
·         Can you supply exhaust pipe from incinerator to the roof, and then whirly bird to avoid the rain water to go into the pipe ?
·         When we install an incinerator within a building, what are the distance to observe between equipment and wall and roof (as we need to supply also the building to house the incinerator )
0 notes