Tumgik
#ahj review
reliablesolar · 1 year
Text
How to Choose the Right Commercial Solar System for Your Business
Tumblr media
When it comes to having a commercial solar system installed, there are a number of factors to consider. Some of them include whether you want it to be grid-tied or off-grid, and how much maintenance and permitting will be required.
Grid-tie
Grid-tie commercial solar system is a photovoltaic system that connects to the power grid. It's an efficient system that can save you money on your monthly energy bills. With a proper design, you may be able to get zero net electricity usage charges.
When you choose to go with a grid-tie system, you can have the option to import and export power. This lets you use your own electricity and also sell any surplus power to your utility company. You can then put that credit toward your electricity bill.
One benefit to grid-tie solar systems is that you won't have to worry about running out of power in the middle of the night. The system is designed to shut off automatically when there isn't enough sunlight for your solar panels to produce power. In addition, you won't have to pay for a backup battery system.
Hybrid
Hybrid commercial solar systems offer a number of advantages and benefits. They provide a safety net during power outages, provide a guaranteed electricity supply, reduce your dependence on the utility grid, and provide a scalable energy source for future needs.
In addition to the typical components found in a grid-tied system, hybrid systems incorporate the latest advancements in battery technology. Lithium batteries are not only smaller and less bulky than traditional batteries, but they also have better energy storage capabilities.
The main advantage of a hybrid system is that it can reduce your dependence on the utility grid. As a result, you have more control over your electricity use. And, with clever controls, you can maximize your usage of the solar power your system generates.
Another advantage of a hybrid system is that you will have a battery backup - a nice perk when the weather is not cooperating. During outages, your system will keep the lights on and the refrigerator running.
Permitting
Permitting a commercial solar system can be an expensive and time-consuming process. It's important to have a complete understanding of the requirements. This can help ensure a smooth installation.
First, a local utility may need to conduct an on-site inspection of the site for the installation. They will also require a wiring diagram and spec sheet.
Next, the installation contractor will obtain the required permits. They will include the cost of the permit in the total cost of the system. Depending on the jurisdiction, the cost of a solar permit could be a few hundred dollars.
Finally, the AHJ will review the solar permit application and approve or deny it. The process may take a day, a week or more.
While the process is complex, the actual permit can be as simple as sending an email to your local utility. Some towns have made the permitting process automated.
Maintenance
If you are thinking about investing in a commercial solar system for your business, you will want to make sure you are protecting your investment. A properly installed system should be in good condition for many years. However, it is important to maintain it regularly to ensure that it performs at its best.
The best way to ensure your system operates at its best is to perform routine inspections and maintenance. There are a number of factors that can impact a solar energy system's performance.
Solar panels are relatively inexpensive, but they may degrade over time if not maintained correctly. For example, a thick film of dust can severely impact the panel's ability to capture sunlight. This is why it is a good idea to have a professional clean your panels each year.
Off-grid
An off-grid commercial solar system is a cost-effective way to reduce energy costs. It can also be an environmentally friendly way to run your business. Whether you are a large corporation or a small business, an off-grid system can help you lower your power bill.
Unlike on-grid solar systems, off-grid systems are independent of the utility grid. They are designed to produce excess electricity during the day, and store the power in batteries. The stored energy can be used during the night.
Off-grid solar systems are ideal for those living in rural areas, and for businesses that are not connected to the electric grid. However, they are not for those living in urban areas. While they are often less expensive than on-grid systems, they are still more expensive than traditional grid-connected systems.
1 note · View note
Text
How to Get the Best Price for Smoke Alarm Servicing
Tumblr media
When hiring a company for smoke alarm servicing, make sure you get full transparency in your price. You should know the price of every single smoke alarm replacement you need, as well as the servicing fees for it. You should know when to replace your smoke alarms — when they have expired, become damaged, or are missing. An experienced service team will ensure full transparency. But how do you know if you’re getting the best price? Here are a few tips:
Salt Electrical
If you want to have your smoke alarms professionally serviced or installed, contact Salt Electrical. This family owned and operated business has been providing residential, industrial, and commercial electrical services for more than 60 years. Whether you have one smoke alarm in your house or several thousand, Salt Electrical has you covered. They are licensed to handle large projects. The SALT team can visit your property every six to 12 months to perform maintenance and repairs. To learn more about the benefits of having your smoke alarms serviced by SALT Electrical, read on.
Licensed journeyman electricians must have NICET Fire Alarm Certification level 3 certification within the past 12 months. Smoke alarms should be installed on ceilings away from corners and heat sources. CO detectors need to be tested at least once a month, and batteries should be changed every couple of years. You can also ask your friends for references or use the internet to find reviews of Salt Electrical smoke alarm servicing. Look for companies with written guarantees for their work and customer service. These companies will focus on the safety of the residents.
Impact Fire Services
If you’re looking for a comprehensive fire alarm service, consider Impact Fire Services. Our team of certified technicians will handle everything from regular inspections to large-scale upgrades. From basic smoke alarm servicing to installing kitchen suppression systems, we’ll help keep your property safe and your fire alarms up to code. Our project managers are NICET-certified fire alarm specialists, with knowledge of NFPA codes and local AHJ requirements.
We can provide your facility with a comprehensive fire detection and suppression system, designed specifically for your building’s needs. Whether your building has one or multiple buildings, our technicians can provide the best solution for your needs. We’ll even inspect your existing fire alarm system to ensure that it’s working properly and meets regulations. When you choose Impact Fire Services for your smoke alarm servicing, you’ll get peace of mind that your system is in good hands.
Safety and Swift Smoke Alarms
Fire alarms are a necessary piece of property safety. They provide around-the-clock notification of fires, giving employees and clients time to evacuate and seek safety. Fire Systems of Michigan provides top-quality fire alarm servicing and repairs. The company has over four decades of experience serving clients throughout Michigan. They are also certified by the National Fire Protection Association (NFPA) and the IDPH. For more information, please visit their website.
Fire-safety professionals from Safety and Swift will check and service your smoke alarms. It is a simple process to test your smoke detector. If it is battery-powered, install new batteries. If you have a hard-wired unit, replace the hardwired unit with a new one. Make sure to check the date label as well, as this is a reliable way to determine the battery life of your smoke alarms.
Detector inspectors
When selling a property, it is necessary to obtain a smoke certificate from the local fire department. This certificate verifies that the property has a functional smoke alarm system. It is important to have a smoke detector serviced annually to maintain its safety. Detector inspectors will also check that the smoke detectors have been properly installed and are in good repair. You can also request for monthly inspections from a detector service company.
The Metropolitan Fire Brigade’s Smoke Alarm Service Guidelines dictate the frequency of the inspection. Smoke alarms should be inspected regularly and tested according to manufacturer instructions. They should also be cleaned and changed every year. Most alarms have a 10 year life span, after which they must be replaced. Photoelectric smoke alarms should be used. New legislation mandates testing for both electrical and gas appliances. Detector inspectors are qualified to perform this testing for both types of devices.
0 notes
hvsolarau · 2 years
Text
Solar Power Installation in Newcastle - What You Need to Know
Tumblr media
If you've been thinking about installing solar panels on your roof or large surface to generate electricity for your home or business, this article will give you the details you need to know. You'll also learn about costs, permits, and battery storage. Ultimately, this project can help you lower your energy bills and become self-sufficient. Listed below are the steps you need to take to get started. This is a great way to save money while still living the dream!
Installing solar panels on roofs or other large surfaces to generate electricity for homes or businesses
Installing solar panels on roofs or other larger surfaces to generate electricity for homes or businesses is possible, but it requires proper planning. The right solar system size depends on a variety of factors, including the energy usage of your home, the square footage of your roof, and the amount of sunlight received by your property. Most homeowners in Maine choose high-rated panels that produce more electricity. A high-efficiency panel also means you need fewer panels.
Another benefit of solar power Newcastle is that they reduce greenhouse gas emissions. Conventional electricity comes from fossil fuels, which emit gases that contribute to air pollution and global climate change. Because fossil fuels are finite resources, their prices fluctuate constantly and can increase significantly. Hence, solar panels are an excellent solution for homes and businesses that want to make a positive contribution to the environment.
Costs
Solar panels and related equipment are the most expensive part of a solar power installation. They can cost thousands of dollars, depending on the type and number of panels. The hardware itself is only about 25% of the total cost. The other 55% of the cost is comprised of soft costs, such as permits, overhead, and sales tax. Of course, the more complicated the installation, the higher the cost will be. Let's look at some common soft costs associated with solar installations.
Costs of solar power installation can be influenced by government trade policies. In the past decade, changes in tariffs have increased the cost of solar. In 2018, tariffs resulted in an increase of 16 cents per watt for the average consumer, which translated to a $960 hike for a six-kW system. President Biden recently put a two-year pause on new tariffs for solar equipment.
Permits
The process of getting permits for solar power installation in many cities and towns begins with contacting your local electric utility. These entities, also known as "Authority Having Jurisdictions" (AHJs), are responsible for monitoring the safety of new construction. They typically are the city or county building department, but may have additional entities that oversee construction. In many jurisdictions, homeowners and installing contractors must notify their utility of the successful installation of their solar panels and energy storage system.
The permitting process can be lengthy and time-consuming. To make it easier, you can seek the help of third-party services that manage the permitting process for a flat fee. Once you've submitted your solar permit application, your utility company and AHJ will review it. If they find any problems, they will communicate with you and give you the necessary information to resolve them. The process can take several days, so be sure to double check your application before submitting it.
Battery storage
If you are interested in installing solar panels but are worried about high utility bills, you might want to consider battery storage. Solar panels and battery storage can work together to eliminate your reliance on the utility. In fact, you can even store the extra energy for emergency purposes, reducing your monthly utility bill significantly. And it's much safer than using small generators. However, battery storage is essential for a solar-powered off-grid home.
In addition to federal tax incentives, state programs are also available to help you offset the cost of your solar and battery storage system. In many cases, these state incentives stack with the federal incentive, meaning your savings are doubled! Take advantage of the various tax incentives available to you by researching the benefits of solar and battery storage systems. They are available in your state or region, and your solar contractor can help you find out more about them and submit the necessary documentation.
Maintenance
When you install solar panels on your roof, the installation process involves periodic inspections, cleaning, and repair work. During these visits, the installer will also check the DC isolator for water. The DC isolator can be a safety hazard, so it is important to know what to do if it leaks water. In addition to monitoring your panels for problems, a solar energy system should be fully maintained to maximize their output.
Performing regular checks on your solar panel array is essential to ensure that it is operating at peak performance. And because solar panels are non-removable, you should also avoid letting animals and people get near your solar power system. You can monitor the production by looking at the software or checking the electricity bill. You should also check the wiring, since these systems can be susceptible to deterioration. You can even get software that displays historical production data. Keeping an eye on your solar panel array can help you avoid these problems.
0 notes
Text
Solar Power Installation Basics
Tumblr media
Before you choose the right solar power installation company, make sure you know the basics. We'll discuss how to calculate the total cost of the installation, explain financing options, and deal with municipal approvals and permits. We'll also cover how to handle warranties and workmanship guarantees. And of course, we'll discuss how to calculate the return on your investment (ROI) when installing solar power. Read on! This article covers all of these important topics and more.
Explaining financing options for solar power installation
If you're interested in getting a solar power installation but don't have the funds to purchase the panels, leasing may be an option. This type of financing does not require upfront payments and can save you anywhere from 10% to 30% on your energy bills. In addition, leasing does not include the solar panels, so you'll likely not receive any federal solar tax credits, and you won't have the benefit of property value enhancement from installing solar panels. In fact, solar installations are typically 3 to 4 percent more expensive than homes that do not have them.
If you don't have the funds to purchase a solar panel system, another option is to apply for a home equity loan. These loans are available for solar panel installation costs and are similar to home improvement loans. They may be easy to obtain and can save you significant amounts of money over the life of the panels. You can apply for a solar loan from a solar panel installation company or bank. If you're unsure of whether or not a solar loan is right for you, ask a solar installation professional.
Explaining warranties and workmanship guarantees for solar power installations
When it comes to securing a warranty for your new solar power installation, knowing what you're getting is crucial. Just like a warranty for consumer electronics, a solar power installation warranty ensures that the solar panel array will not break within a certain period of time. Most consumer electronics products come with one year of coverage as standard. But there are extended warranties for PV products, which will offer even longer coverage.
A warranty for a solar panel will cover any defects in the manufacturing and installation of the Panel. This warranty is provided by the manufacturer of the panel. This warranty is not applicable to the solar installation company, but only to the solar panel itself. When comparing panels, it's best to select a system that has a minimum warranty of ten years. If the warranty is less than 10 years, it's best to purchase a higher quality panel with a longer warranty period.
Handling permits, applications, and municipal approvals for solar power installations
Solar permit applications can be time-consuming and costly. It may also require specialized engineering or research by a licensed professional. Utility companies or the Authority Having Jurisdiction (AHJ) will review the application and provide feedback. If any issues are discovered, the homeowner can resubmit the application. However, the entire process can take a few days, so it's wise to double-check your application before submitting it.
Handling permits, applications, and municipal approval process is essential to the success of your solar installation. Local government permitting authorities are becoming increasingly cautious with solar energy installations and have stricter regulations. It's best to plan extra time for the installation to ensure proper compliance with building codes. However, new policies and regulations can snag the solar permitting process, increasing the overall cost of the installation. Luckily, there are ways to reduce these expenses and speed up the permit process.
Calculating total cost of solar power installation
If you want to calculate the cost of a solar power Perth, you should use the following calculators. Some of these are based on a satellite image of the roof, while others are based on your electricity bills. These calculators will not give you a sample price, but they will give you a general idea of what your solar system will cost. Some calculators will also include incentives, which can create significant savings. If you're looking for an accurate estimate of what you will pay, you can use FindSolar's calculator. The calculator will use the amount of sun your house receives and how much your power bill is each month to determine the size of your solar system.
A few other factors play a role in calculating the total cost of solar power installation. For example, the roof of your house may be sloping 30 degrees or more. If your roof is sloped properly, the solar installers will be able to install the panels in a single plane, which will decrease the cost of the installation. Similarly, a roof with a dormer or multiple levels will require additional equipment and installation costs.
0 notes
solarandbatteries · 2 years
Text
Solar Panels Installation - Things to Consider Before Installing Solar Panels
Tumblr media
There are many things to consider when getting a solar panels installation done, including whether building permits are required, the cost of the solar panel installation, and how to get a free quote for the job. We'll also talk about the process of wiring the solar panels, which includes fuses and junction boxes. And finally, we'll discuss the importance of safety while working with solar panels. We hope these tips are helpful for you as you prepare to install solar panels in your home or business.
Building permits required for solar panel installation
Before installing solar panels, you need to acquire the proper building permits. The process of acquiring these permits is not an easy one. The time required to process your application varies from jurisdiction to jurisdiction. If your application is rejected, the entire process will take longer and cost you more money. The Authority Having Jurisdictions (AHJ) and utility companies will review your application and provide feedback. If necessary, you can make corrections and resubmit the application. Once you've obtained the permits, the solar installation company will begin the installation process.
In addition to the building permits, the local government will require a solar inspection. The inspection will be performed in phases to ensure that you're following the plans and remain code-compliant. The initial inspection will check the structure of the roof, wiring, and soil engineering, so you can build a stable base for the solar panels. The final inspection will be performed by an electrical inspector, who will also check the power output of your new solar panels.
Obtaining a building permit is essential before installing solar panels. Not only do you need a building permit for solar panel installation, but you also need to obtain a permit for the wiring and installation. If you are planning on installing solar panels on a commercial property, you may need to seek permission from the property manager. If you need to have a building permit for your solar panels, make sure you contact the zoning board of your jurisdiction. Some zoning boards even offer online permit applications.
Costs of installing solar panels
Aside from its environmental benefits, installing solar panels can reduce your utility bills. The installation of solar panels may cost thousands of dollars. However, the initial investment in a solar panel system can be recouped well before decommissioning it. This way, you can enjoy its benefits for years to come. According to a Pew Research Center survey conducted in 2019, nearly 80 percent of homeowners were interested in solar for its financial benefits.
Considering the cost and the time spent in installing solar panels, the initial outlay can be comparable to that of a new car. However, the initial cost of a solar energy system depends on many factors, including the size of the home, the climate, and the type of solar panel you choose. For example, if you want to install a large solar power system, you will have to buy more panels that have higher wattage.
To calculate the amount of solar energy produced by a single solar panel, you need to know your current electricity usage and how many panels you have. Then, divide that number by the wattage of each solar panel. For example, a single solar panel with a wattage of 150 watts will produce 10,600 kWh annually. In order to determine the exact wattage of solar panels, you need to multiply your estimated system size in kW by 0.78. To account for inefficiency, multiply your wattage by a factor of 0.78.
Getting a free quote for solar panel installation
Getting a free quote for solar panel installations can help you decide if solar is the right option for your home. You can save as much as $5,000 when you shop around for the best price. Typically, the largest solar installers quote inflated prices based on brand name. While comparing bids from national brands and local solar companies, you may be able to save a lot of money if you choose a smaller company.
Solar installation requires a number of steps. First, the solar installer will prepare your roof and install electrical wiring that connects your panels to the power system. Once this is done, the solar panels are installed on top of roof racking. The inverters and control circuitry convert solar power into electricity. Next, local government inspectors will check your installation. They look for any faulty wiring or violations of electrical codes.
If you decide to go through an independent solar installer, the company will perform a thorough inspection of your home. They will check electrical panels, circuit breakers, and roof structure to make sure they are structurally sound. The installer will then order equipment and add you to their queue. The process will take about a week or two, so be sure to give yourself enough time. You can also take advantage of government incentives for solar panels. The residential federal tax credit is 26% of the total cost of installation. But this credit expires in 2024.
0 notes
ainajoom · 3 years
Text
THE IMPORTANCE OF A FIRE SAFETY PLAN AT YOUR FACILITY
Fires affect thousands of companies each year resulting in injury, lost customer trust and building damage. By establishing a fire prevention and preparedness program, with the help of a fire safety and protection company,  you can help avoid injuries to your employees and visitors, costly damages, and potential fines to your business. ANAT provides the Fire safety equipment like fire alarm, fire fighting services and MEP Services.
Below are some best practices to help prepare your facility for a fire emergency.
Implement a Fire Emergency Evacuation Plan – Emergency response is easier when everyone knows their respective responsibilities. Establish a detailed fire emergency evacuation plan that dictates how to respond, when to respond, and identifies a path of egress. If employees have special needs or require special attention, address these details in the plan.
Establish a Fire Prevention Plan – A fire prevention plan provides facilities with documentation outlining the employees responsible for identifying combustible materials, fire hazards and heat-producing equipment. It also outlines the procedures necessary to prevent potential emergencies. The fire prevention plan should be communicated with all employees and available in writing for review at any time.
Train Team Members – On an annual basis, the Occupational Safety and Health Administration (OSHA) and NFPA require fire extinguisher training for employees. Every employee should receive required training and be briefed on new or updated regulations.
Maintain Emergency and Exit Lights – To ensure paths of egress and exits stay illuminated at all times, implement a routine maintenance plan to check lights and replace broken or burnt out bulbs. In addition, regularly test emergency backup power and exit lights to confirm they are functioning.
Practice Proper Housekeeping Techniques – Daily housekeeping tasks play an important role in keeping facilities clear of fire hazards. Make sure trash and packing materials are in metal containers with tight-fitting lids. Clean up flammable materials immediately, including chemical spills and oil to reduce the risk of fire. Likewise, extra storage and equipment should be in proper storage areas clear of aisles or fire exits and not interfering with automatic sprinkler systems.
Create a Fire Emergency Response Team – Develop a team of individuals who are trained and educated in fire emergency plan procedures and are willing to enforce fire safety and prevention methods throughout the building. ANAT is the fire safety company in Ajman, UAE. The team members will assist others during a fire emergency and help guide people to safety.
Preventative Maintenance – Enlisting a licensed and certified fire protection company provides facility managers with quality inspections, safety tests and repairs to fire protection equipment. Establish frequencies as outlined in NFPA code by the equipment manufacturer and the local Authority Having Jurisdiction (AHJ).
By following these guidelines you can be sure your facility and your employees will be prepared in a fire emergency and be able to react properly and safely.
0 notes
livvyofthelake · 3 years
Note
how do u pronounce homage, though 👀
oh thank you for giving me the opportunity to talk about this random bit of information i became very knowledgeable on last night! right so i’ve always pronounced it like “oh-mahj”, which is the french way of pronouncing it, i am not nor have i ever been french, so it’s admittedly a bit weird that i say it like that. idk. anyway, my dad was pronouncing it like “hom-ahj” with the h, which i think sounds ugly as hell. and apparently the correct way of american pronunciation is “ah-mahj” without saying the h. my authority for all this comes from this video, which is from a french guy, and the word is french in origins, so i trust him
but ultimately all three of those are valid ways of saying that word, and it’s a word you’ll use maybe once every six months unless you like, review movies on youtube. so it’s all very pointless.
anyway it only came up because we were talking about riverdale’s the midnight club, and my dad was saying it was copying the breakfast club, and i was saying it was an homage. anyway it’s not my problem that he couldn’t appreciate one of the greatest 45 minutes of television ever produced, and had to resort to nitpicking my pronunciation to avoid losing an argument. i would now like to direct your attention to this tiktok about the breakfast club that i think is speaking straight up facts <3
0 notes
akanksharana · 3 years
Text
WattMonk give you best of both worlds - People & Machine learning
Machine Learning has proven to be one of the resourceful method of data analytics. Amidst all the hype around Big Data, we keep hearing the term Machine Learning. What exactly is ML? Well, if we go by the google definition, Machine Learning is the method of data analysis that automates analytical model building. It is a branch of artificial intelligence based on the idea that systems can learn from data, identify patterns and make decisions. Diving deep into its advantages,
  It is helps in easily identifying trends and patterns:
Machine Learning can review large volumes of data and discover specific trends and patterns that would not be apparent to humans. For instance, for an e-commerce website like Amazon, it serves to understand the browsing behaviours and purchase histories of its users to help cater to the right products, deals, and reminders relevant to them. It uses the results to reveal relevant advertisements to them.
      Automation:
With ML, you don’t need to babysit your project every step of the way. Since it means giving machines the ability to learn, it lets them make predictions and also improve the algorithms on their own. A common example of this is anti-virus software; they learn to filter new threats as they are recognized. ML is also good at recognizing spam.
Tumblr media
          Continuous Improvement:
As ML algorithms gain experience, they keep improving in accuracy and efficiency. This lets them make better decisions. Say you need to make a weather forecast model. As the amount of data, you have keeps growing, your algorithms learn to make more accurate predictions faster.
    Handling multi-dimensional and multi-variety data:
Machine Learning algorithms are good at handling data that are multi-dimensional and multi-variety, and they can do this in dynamic or uncertain environments.
    Wide Applications:
You could be an e-tailer or a healthcare provider and make ML work for you. Where it does apply, it holds the capability to help deliver a much more personal experience to customers while also targeting the right customers.
Although, ML needs enough time to let the algorithms learn and develop enough to fulfil their purpose with a considerable amount of accuracy and relevancy. It also needs massive resources to function. This can mean additional requirements of computer power for you. While, Machine Learning can be incredibly powerful when used in the right ways and in the right places where massive training data sets are available, it certainly isn’t for everyone.
But is Artificial intelligence enough for smoothly running operations?
A study suggests, Interpersonal skills are extremely important for creating and maintaining meaningful personal relationships in the workplace. People with good interpersonal communication skills can, therefore, build healthy relationships with their colleagues and work much better as a team. 
Good interpersonal communication skills are also necessary for managers to help their employees do their jobs successfully. Leaders need to be able to pass on the right skills to the employees that will enable them to perform their tasks and achieve business goals. Moreover, they should be the ones to teach their employees interpersonal communication skills. 
 This year, we have all witnessed the importance of communication in the workplace. With the emergence of remote work, interpersonal communication among peers, colleagues, managers and leaders has been disrupted. Yet, it is more important than ever before. In order to keep their cultures open and transparent, employers need to continue to drive engaging workplace conversations even when employees are physically dispersed. 
For any operation to go down smoothly, it must have a good amalgamation of artificial intelligence and a skilled team. This is where WattMonk comes into picture. Due to people in place, WattMonk understands the urgency of a project and can be done in hours instead of days. With highly skilled and industry’s best human as well as technical resources, the company appoints a good team for your project, so that it does not lead up to unwanted delay.
WattMonk, which is the first virtual solar assistant, is playing their role by catering the best administrations so that you could enjoy the hassle-free time.
We all want our desired work to be done with utmost priority and preciseness such as prelim design plan of your sun panels, WattMonk being capable of delivering the Prelim plan in only 1 hour* of configuration demands is the way you realize that you are the priority.
Prelim Design being done next, you are stressed over the Survey of the solar site, be it your home or your corporate office, what about an application that updates about the pictures that you have taken and the one that needs to be captured, effectively making the interaction smoother rather than you going to and fro to the spot or taking time out of your bustling timetable to tick pending to-do list. Getting an agenda, placing all the pictures in a single place makes the entire process smoother with WattMonk.
The determined right plans for AHJ endorsement at a reasonable price ensure that you do not lose your important time in the amendment of plans. Be it your Permit plan, PE Stamping or exact drawings for the reason. This will help you save time in requesting and evaluating of all Solar ventures in a single place.
Services including Complete Sales proposition, Site appraisal report, Accurate Shade Analysis utilizing, LIDAR innovation, Realistic 3D Design of Site, and that is only the tip of the iceberg, to serve you only the best.
From a highly skilled & experienced design team to ensure design delivery in few hours to app/platform for ordering designs, collecting solar info at one-place and many other errands to run.
WattMonk you nothing but the best of both worlds- People & Machine learning
Tumblr media
Reach out to them to order your PV Design Package in just a span of 5 minutes and get your first PV design for free.
You can mail them at [email protected], or check out their website to know more: https://www.wattmonk.com/
Telephone Number: 973-609-9241 
0 notes
ladakhtimes · 4 years
Photo
Tumblr media
Press Release Div Com Biswas reviews flight resumption preparation in Ladakh Leh, May 23: Divisional Commissioner Ladakh Saugat Biswas chaired a review meeting regarding preparations for resumption of flights in Ladakh during the lockdown period triggered by COVID-19 pandemic here today. The commercial flights are scheduled to resume their operation from the 25th. Deputy Commissioner Leh Sachin Kumar, Senior Superintendent of Police Sargun Shukla, Chief Medical Officer Leh Motup Dorje, APD Airport Authority of India Leh Sonam Norboo, SP Traffic Mohd. Ramzan Giri, Inspector AHJ Sonam Rigzin, Airport Manager Air India P. Angmo, Station Manager Spice Jet Dorjey Rabstan, Airport Manager Go AirLines (I) Ltd. Tariq Wani, and Assistant Manager Vistara Airlines Mohd Ramzan Khan were also present. Div Com Biswas reviewed the preparations regarding arrangements on every component covering security, passenger entry, baggage handling, check-in counters, sitting arrangement before boarding the plane for the out-bound passengers. Similarly, the de-boarding of in-bound passengers, their baggage handling, screening as well as data entry of every passenger was discussed in detail. APD Sonam Norboo gave a detailed account about the arrangements at the airport from check-in, boarding, collection of baggage to exit point. Check-in at the check-in counter would be app-based to generate boarding pass and the baggage tags by the passenger. Floor marking has been made for check-in counters and all other points. The chairs are marked to guide the passengers to sit while maintaining social distancing. As per the protocol, a passenger is allowed only one luggage and one cabin baggage, he added. The passengers would be required to use mask and gloves, and maintain social distancing while travelling. Div Com Biswas gave instructions to the security team to not to allow any passenger/person to enter the airport premises without mask. Clear instruction was given to the medical team for screening of every passenger on their arrival at Leh airport. Strict compliance of social distancing must be maintained while collecting baggage from the conveyor belts, : continue read in comment box (at Ladakh, India) https://www.instagram.com/p/CAiLUjWlqtM/?igshid=10x24q1u981fw
0 notes
csrgood · 4 years
Text
Safety by Design: Safe Projects From Concept to Facility Operation
Originally published by CRB
Lindsay Kenney, Associate, Core Team Leader Matt Heritage, Regional EHS Manager
Everyone involved in a construction project has their own skillset, knowledge base, and experience. Each position looks at a project through a unique lens. Designers and architects look at what is being built, construction managers look at how to build it, and Environmental, Health, and Safety (EHS) professionals look at how to build it safely.
Historically, when companies wanted something built, one team designed it and another team built it. There was only as much cross-communication as was needed to get the job done. It was up to the trade companies who actually swung the hammers to figure out how to do it without hurting someone.
Unfortunately, this method leaves a lot of room for error. Regulatory standards can be missed during design, workers can be forced into dangerous situations, and efficiency suffers. This all adds up to missed deadlines, lost revenue, and increased costs from higher premiums, fines, and settlements.
“I’ve walked into many facilities over the years and found problems built into the facility. Code violations, regulatory violations, unsafe conditions, you name it. It’s disturbing how many builders unknowingly (or knowingly) leave these pitfalls for their clients after turnover.” - Matt Heritage
The good news is that this is easily fixed. You can have the best of both worlds: projects that are budget-friendly and efficient without sacrificing any safety or quality. Safety by Design is a method of collaboration that brings design, EHS, and teams together to ensure that facilities are safe to build and safe to use. Here’s how we do it at CRB and how you can implement this approach.
Safety collaboration from conception through facility turnover At CRB, we believe that a successful design is more than a beautiful building. We believe that the journey is as important as the destination. Why? Because the journey is where we save our workers’ lives and livelihood. It’s where we ensure the product the client receives is the best possible investment quality wise. And ultimately, the journey is where we save our clients’ money. This is Safety by Design.
In order to achieve this, CRB uses full team collaboration during every phase of each project. We know that everyone has something to bring to the table, and the sooner their experience can be put to use in the project, the better for everyone involved. When CRB designs a project, we don’t just look at structural integrity, we look at how the workers can build it safely.
CRB’s EHS team doesn’t just sit around on project sites checking permits and looking for hazards. At CRB they do so much more. Our EHS team works closely with CRB’s design group. The two teams collaborate constantly to ensure nothing is missed when it comes to regulatory standards, worker safety, or environmental considerations
From adding well-placed fall protection anchors for steel workers to designing dust mitigation strategies for workers’ health and clean-build protocols, CRB always endeavors to ensure the entire construction process is as safe as possible.
An example of our commitment to our Safety by Design philosophy happened on a recent project. Our original designs lacked sufficient access and egress for confined spaces in parts of the facility. This could have become a real safety issue both during construction and after the facility was turned over to the client. It also violated regulatory standards, which could have landed the client in hot water down the road.
However, because our EHS department and construction team were involved from the start, they caught the problem and fixed it before it became an issue. Everyone put their heads together and found a great solution that saved time, money, and potentially lives.
Ultimately, every project is unique, meaning that each involves its own set of challenges (safety and otherwise). Given the variety of concerns and issues you may run into, having experienced veterans of the trade at the table too is invaluable. Leveraging their expertise will cut out unnecessary research, decision-making, and second-guessing.
We’re currently guiding a client’s project team as they make decisions about their alarm system—what kind of alarms to install, what strobe lights are ideal, and how best to tie all of it into their existing system. It’s saving them a lot of time and money and giving them greater confidence that their finished facility will be exactly as it should be. Without our design, EHS, and construction teams working closely with the client from the start, they would have missed out on some golden opportunities to save money and increase the safety and efficiency of their investment.
How do we approach Safety by Design? In order to reap the true rewards of this system, you have to start with a focus on safety, collaboration, and communication that permeates the entire project.
Safety It might seem counter-intuitive, but sometimes the most obvious factors are the easiest to overlook.
In any complex project, establishing priorities is essential. If you emphasize efficiency or low costs while not making safety a priority, then you can expect incidents. Make safety a high priority from the beginning, and lead by example. This can be as simple as a daily safety brief during the build phase. Start each day showing your trade workers you take safety seriously.
This can also mean ensuring your construction management team knows regulatory standards. Consider providing training to your team so everyone is knowledgeable about relevant codes and requirements. If the construction team knows the guidelines—like how wide a hallway should be—and they’re given the authority to speak up, they can help by being a last line of defense against a costly mistake, design flaw, or code violation.
Efficiency matters, budget matters, quality matters—and safety matters, too. Make that abundantly clear right from the start, and then carry it through to turnover and beyond.
Collaboration In order to get the most out of the varied skills and perspectives of different teams, silos have to come down. Get the design team, the EHS team, the project team, and even the local authorities having jurisdiction (AHJs) all sitting at the same table from the beginning.
Every group and every individual has the potential to offer valuable input. Don’t leave anyone out. Tear down walls and build bridges. CRB proves this works by consistently being an industry leader in worker safety, design innovation, and customer satisfaction.
This collaboration and communication needs to happen in every phase of the project, from the beginning to the end. At CRB, we involve our design, EHS, and construction team in every phase. Constructability reviews and input happen during the design stage as well as design reviews of contractor scopes and work plans.
For instance, we often have our engineers review the work plan for passivation of the sanitary piping systems—a process of cycling hot acid solution through the sanitary piping lines to create a passive layer within the pipe for corrosion resistance. We design valving and shut off points into these systems to make the dangerous process as easy and safe to execute in the field as possible. Then, through the work plan review, we make sure that the people doing the actual work follow strict safety parameters.
Although additional valving for this process does cost more, we’ve found that temporary workarounds can be even more costly—not to mention the potential cost of a dangerous spill.
Communication Even if someone sees a potential risk or thinks up a better idea for a design, it won’t do anyone any good if it doesn’t reach the right ears. You have to make sure that those ears are always open. Put egos aside and give everyone their chance to provide input. Get the teams discussing safety openly, transparently, and honestly.
Be willing to listen and encourage everyone else to do the same. If someone shares an idea that doesn’t go anywhere, you haven’t lost anything but a few minutes of your time. If someone notices inherent dangers in a design but doesn’t feel like they have the right to speak up, you might lose a whole lot more.
“We have found that this level of open communication gives the team a greater appreciation for the challenges they encounter in their work. Additionally, it allows them to see a design or a situation from someone else’s perspective, which improves the overall quality of our work. When it comes to safety, there’s no room for compromise. ” - Lindsay Kenney
Make safety a value In a market where everything has to be faster and cheaper, it’s more important than ever to develop a culture that views safety as a value. Preaching safety after an incident doesn’t work. It has to start from the beginning. We’ve seen first-hand what a difference it can make for us and for our clients.
When you bring teams together, promote healthy communication, and maintain safety front-and-center, everyone wins.
source: https://www.csrwire.com/press_releases/45547-Safety-by-Design-Safe-Projects-From-Concept-to-Facility-Operation?tracking_source=rss
0 notes
delhi-architect2 · 4 years
Text
Journal - An Architect’s Guide to Building Codes: 7 Steps to a Safer Design
Mike LaValley is the architect, speaker, and writer behind Evolving Architect. For more creative and nerdy insights, follow him on Instagram or check out his upcoming book.
Building Codes. Why did it have to be Building Codes?
At first glance, they sound a little bit boring, a little bit real, and a little bit scary.
Any architect who doesn’t respect Building Codes is probably not doing their job.
So what are Building Codes exactly? And why do we need to make sure that we understand them as architects? Because trust me, you do.
They may seem like something to gloss over when you’re trying to make your next design masterpiece, but Building Codes protect those who use the buildings you design.
Building Codes 101
While there may have been ramifications for poor construction, construction hazards, and construction mishaps in the past, it wasn’t until the 1800s when the first Building Codes were established. As industry and technology continued to thrive, the potential for new hazards such as sweeping fires became far more common.
And so, at the most fundamental level, Building Codes were established in order to protect the Health, Safety, and Welfare of society.
Jurisdictions
Originally, the Building Codes weren’t very pretty. In fact, when Building Codes were first established, they varied greatly and held much different priorities from one another. Over time, Model Building Codes were been developed by regularly iterating upon them and a continued collaboration of professionals across the globe.
Today, you’re far more likely to come across a situation that is treated in a familiar way between states because of the adoption of the International Building Code. Even so, most States adopt the larger Building Codes such as the IBC and make modifications to it based on their specific political and regional priorities. For example, California is more likely to strengthen Building Codes related to earthquakes and seismic activity than a state like Vermont.
As an architect, it’s an inherent responsibility to identify what Code applies to your project and who is the Authority Having Jurisdiction (AHJ). The AHJ will have the final interpretation on the Building Code for your project and will be able to enforce the Code in kind.
Navigating the Building Codes
Each and every time I sit down to perform a Code Review, I know the review will be unique to that particular project. It’s something that you realize very quickly – No Code Review is ever the same.
When I start looking at the Code, I go through a series of basic steps to help guide the types of major information I need to document and confirm. Skipping steps is not advised. It can lead to backtracking later, missing critical information to assist in design, and possibly the need to change conditions during construction for a much higher cost in order to meet key Code requirements.
The Steps:
Occupancy Classification
Sprinkler Systems
Construction Type
Allowable Floor Area
Building Height and Number of Stories
Location on Property
Means of Egress
Step 1 – Occupancy Classification
The first thing you need to know about a given project is what the project will be used for. It sounds simple, right? But do you know what the difference between an S-1 and S-3 Occupancy Classification is? Do you know when to classify an educational project as a Business (B) Occupancy over an Educational (E) Occupancy?
I’m not saying that you should be able to rattle off the answers to the above questions from the top of your head. The point is that you should check to see if the project requires an Occupancy type regardless if you’ve done a hundred projects before just like it.
I’ve performed many Code Reviews in my career to date, and I was caught off guard when an Occupancy that I had assumed for a project was completely different because of one difference from previous projects I had worked on.
As a good friend always reminds me, “Don’t Assume, you’ll just make an ‘Ass’ out of ‘You’ and ‘Me.’” Lame, I know. But it’s effective. In some ways, the Occupancy Classification dictates everything. Youíll treat every move you make differently based on what types of activities will take place throughout the project.
Just think about it. A hospital has so many different needs than an industrial factory. A school uses different programs compared with a big box retailer. There are different levels of hazards at each. Some are less hazardous than others. Some are more dangerous and have to be dealt with appropriately.
As such, Occupancy is the key to determining almost every other piece of information in the Code Review.
Step 2: Sprinkler Systems
I’m not a plumber and I don’t imagine I’ll ever be one. But damn if I don’t appreciate how much easier a good sprinkler system makes my life as an architect. Anyone who has ever done a Code Review will tell you the same thing. Sprinkler systems, while not always required per Code, will almost always reduce the construction restrictions and requirements for the rest of your project.
The Building Code is primarily concerned with safely protecting the users of a building. It’s also concerned with protecting property. Even without specific requirements for them, Insurance Companies will often lower an owner’s insurance rates if the project incorporates sprinkler systems.
Let’s make no mistake here: Sprinkler systems cost money. Depending on the type of fire suppression you’re using, they can be very expensive on top of the overall cost of doing a project in the first place. They also tend to be one of those items that some Owners shy away from because it’s not something they see active value from.
In short though, they make my job easier — a lot easier. Sprinkler systems can reduce the requirements for fire-rated wall, ceiling, and floor assemblies, or in some instances, negate them altogether. I remember working on one project where the building was just on the edge of needing a sprinkler system. It wasn’t a mandatory requirement, but the owner ultimately decided to incorporate one because the offset in all of the labor to properly rate the associated corridors throughout was worth it. The sprinkler took all requirements down by an hour of fire-rating, essentially negating the need for fire-rated assemblies in 80% of the building.
No need for special wall systems. No need for additional specifications.
I love sprinkler systems.
Step 3: Construction Type
Did you know that there’s actually MORE than one way to construct a building?! Stop the presses!
Anyway…
Yes, indeed. There are a variety of ways to build a building. But according to the International Building Code, there are technically only 5 types of construction.
A bit confusing, but it’s straightforward when you think about it. Each Construction Type assumes not only an inherent set of potential materials that can be used, but also how flammable those materials are.
On about 90% of the projects I’ve ever worked on, Type IIB Construction has been used because of the fact that it provides a common palette of non-flammable materials to select from. Because of that, it’s also able to bring many Fire-Rating Requirements down to 0. On the one hand, you’ll be paying a premium to use materials that are more flame resistant, but you gain the freedom to use them in a much more liberal way.
Step 4: Allowable Floor Area
Alright, I’m going to get real with you. We’re into the less exciting portions of Code Review, albeit important ones.
Allowable Floor Area is the maximum amount of square footage the Building Code allows each Floor Plate of a Building to be built to. There are charts that tell you this number based on (you guessed it) the occupancy and construction type. An included sprinkler system may extend the allowable floor area as can a building’s proximity to property lines.
Step 5: Building Height and # of Stories
Another part of the Code that will truly knock your socks off is Allowable Building Height and Allowable Number of Stories your Building can be built to. You’ll find that, like Allowable Floor Area, a Building’s Height is dictated primarily by Occupancy and Construction Type.
Another factor that you have to consider is that many Buildings can be limited by real-world things like Fire Truck Ladders and other life safety equipment. There are obvious exceptions (I see you skyscrapers), but just keep in mind that many of the Code Requirements for Building Height can be lessened as other concessions are made such as Sprinkler Systems.
If you haven’t realized it yet, the Building Code exists to protect people and property. To a degree, it doesn’t care how you do it as long as you do it one way or another.
Step 6: Location On Property
Ok. Now we’re back into the exciting stuff – Property Lines!
Ahem. Ok, well I was excited.
Imagine two scenarios. The first — two, five-story mixed-use buildings in an urban environment that have a zero lot line, meaning they are literally right next to each other. The second — a large munitions facility in the middle of nowhere with ample amount of space between the building and its property line; hundreds and hundreds of feet. When I say nowhere, I mean the only thing nearby is open field as far as the eye can see.
Which is safer?
One could argue that the two urban buildings are safer because they’re not building things that explode.
But I’d actually argue in this case that the two urban buildings require more attention here in terms of their location. Maybe the munitions facility is building hazardous products, but the two urban buildings are far more likely to endanger each other, causing injury to people or property.
The requirements for the separations between these buildings is much higher because the Building Code would require that they essentially protect themselves from each other.
If there was a fire in one building, the fire rated assemblies must be constructed in such a way as to prevent loss to the other structure.
In the case of the munitions facility, it’s removed enough from all other buildings that it actually is more likely to have a lower exterior fire rating based on property location alone.
Step 7: Means of Egress
It’s not just enough to protect users from other buildings. Once the overall requirements for the building have been established by Steps 1 through 6, an architect needs to properly map the Means of Egress (aka safe path out of the building).
It takes a significant amount of planning to ensure that not only is there a proper path out of the building, but that the path is no greater in length than the maximum distance allowable and that the path is protected at various stages to ensure safe passage.
If there are too many people calculated for a given space, you may even need a second means of egress from that space and out of the building.
I’ve found that determining the proper means of egress for all spaces in a project is often the place where I spend most of my time in a Code Review. Many of the previous criteria become readily apparent with experience, but the Means of Egress is always different from project to project because the spaces area always different.
When in doubt, think about how many exits from a space are required, how far the Code will allow someone to travel before exiting the building, and how much the building has to protect their paths from where they start to the building exit.
WITH ANY LUCK, IF YOU FOLLOW THE SEVEN STEPS ABOVE, YOU’LL HAVE YOURSELF THE START OF A BUILDING CODE REVIEW.
Other Considerations
The Building Code is up to your interpretation as a Design Professional, but NEVER try to break the Building Code. Your design intent must always align with the Codes established to protect the Health, Safety, and Welfare of those who will use your built work.
I’ve noticed that sometimes younger staff (without knowing any better) will avoid having to research the technical standards required to execute the nuances of fire-rated construction or neglect to analyze each room for compliance with ADA.
I’ve started to recognize that many without a professional license, just ‘doing a job,’ tend to care less about whether or not things are actually Code-Compliant in every instance.
Having been doing this for a while now, I can tell you that if you’re working at a firm and it’s not your stamp on the line, that doesn’t mean you can or should ignore anything that may be in non-compliance with the Building Code.
It’s possible that you’ll miss something in your own Code Reviews. No one is perfect, but architecture and the responsibility we hold as architects is much more than most.
No offense intended when I say this, but if a graphic designer misspells something, it won’t accidentally kill someone. If a Candy Store manager doesn’t sell their quota in lollipops, the store won’t start on fire.
I think of it this way: No matter how you analyze the Building Code, make sure that you’re doing your due diligence to protect those people who rely on you to do your job. They have families. They have lives. Building Codes are in place to make sure they keep on living them.
Further Reading on Building Codes
Also, I’m an Architect, but I don’t memorize every aspect of the Code. I’m always trying to understand more about it.
Here’s some additional reading and a few key resources to help you on your own Code journey.
Up.Codes – A Free Building Code Website to Easily Help You Track the Latest Building Codes
Building Codes Illustrated – By Francis D.K. Ching
ICC – International Code Council – Gate Keepers of the International Building Code
NFPA – National Fire Protection Association – Standards Regarding Fire Protection in Construction
ADA – Americans with Disabilities Act
This post originally appeared on Mike LaValley’s Evolving Architect blog. Architects: Showcase your next project through Architizer and sign up for our inspirational newsletter.
The post An Architect’s Guide to Building Codes: 7 Steps to a Safer Design appeared first on Journal.
from Journal https://architizer.com/blog/practice/details/young-architect-guide-building-codes/ Originally published on ARCHITIZER RSS Feed: https://architizer.com/blog
0 notes
nextstepelectric · 5 years
Text
local electrician near me Russell Ontario
Contents
Paris ontario billie jean
County state form/state fees michael wenzel
State form/state fees stephen
handy electrician near me Waterdown Ontario electrician services near me Kleinburg Ontario Village of Kleinburg, Kleinburg: See 41 reviews, articles, 10522 Islington Avenue, Kleinburg, Vaughan, Ontario LOJ 1CO, Canada. Save. share. review highlights. terrible service. I have been here 3 times in the past month, same waitress, I believe she is new and I don’t blame her.certified electrician near me paris ontario billie jean (Mikudik) Baker was born June 16, 1948, at Rapid City, SD to Harold and Betty (Deibert) Mikudik. She attended country school near her parent’s ranch, first at Stoneville School and then Lucerne School through the 8th grade, then attended and graduated high school in Sturgis.6 reviews of Golden Leaf Chinese Reataurant "Gentlemen running the front was very kind, and helped with all menu questions. The food was incredible and tasted/looked so fresh. Only downside was they looked like they were babysitting a younger.
Tree limbs are caught under a railway bridge as Russell Maloy checks the level of the Cape Fear River in Fayetteville, N.C. An American flag flies in the wind as the Cape Fear River rises to near.
Line No. County *AHJ City or Township Form and Fees Inspector Phone 1 Aitkin State Entire county state form/state fees michael wenzel 218-270-2265 2 Anoka State Bethel State form/State fees Braden Trende 763-232-7569 3 Anoka State Blaine state form/state fees stephen Tokle 763-390-9255 4 Anoka State Columbia Heights State form/State fees David Sawyer 763.
find electrician near me Carleton Place Ontario Electrical Contractors in Carleton Place, ON with reviews, maps, and contact information. electrician for hire near me Welland Ontario electrician companies near me Welland Ontario electrician near me cheap Middlesex Ontario 32 reviews of Affordable Electrician "Our house was built with no fixed lighting and we were in need of. It cost me $330..
Electricians & Electrical Contractors Near Me |. – 2019-11-14  · YellowPages.ca furnishes contact listings about Electricians & Electrical Contractors across Canada. Discover nearby Electricians & Electrical Contractors near you with YP.ca’s complete local business listings. With Yellow Pages you can be sure to find exactly what you’re looking for the first
Sparkling white sand from Ontario, bright white cement powder from Mexico, and a gray local. the near future. Kevin Shea, engineer with AME, discussed the building management system (BMS), which.
near where Academy Sports is now. Students thought the restaurant was so good that, at one time, it had exclusive rights to catering the university football games, says Steven Brown, a Richard B.
Of the three major nuclear plants located in Ontario, Bruce Power near Lake Huron is the largest. From day one, there has been a current of opposition to nuclear power, and like an electrical surge.
“They just want to spread smears and throw mud at me and our party,” said May. The Greens dropped their candidate in the Ontario riding of Glengarry-Prescott-Russell on Oct. 7 for not agreeing with.
 · Russell Medical Centre, Russell, Ontario. 7 likes. Doctor. How is it possible to charge patients $50 to transfer their medical records to a new doctor because Dr. Debanne left and you didn’t make the roster for the doctor that replaced her????
If you are thinking about the career of Electrician, you might want to take your thoughts one step further and consider your career goals options once you have become a certified Journeyman Electrician. The Certificate of Qualification is the first step to continuous learning in the trade.
youtube
from Ontario Sound electrician Parry - Allelectricalproducts https://www.allelectricalproducts.com/local-electrician-near-me-russell-ontario/ via https://www.allelectricalproducts.com
0 notes
buynsellsolar-blog · 5 years
Text
Solar groups developing software to streamline PV permitting process
New Post published on http://roofnrays.com/solar-groups-developing-software-to-streamline-pv-permitting-process/
Solar groups developing software to streamline PV permitting process
The Solar Energy Industries Association (SEIA) and The Solar Foundation are joining the National Renewable Energy Laboratory (NREL), several national residential solar companies, and other nonprofit organizations to develop new automated permit software for distributed solar and storage, reducing the cost of solar installations and saving resources for local governments and taxpayers.
NREL was awarded $695,000 in new funding from the U.S. Department of Energy’s Office of Technology Transitions, Technology Commercialization Fund to develop and deploy the Solar Automated Permit Processing (SolarAPP) software platform. The intent is to dramatically reduce the time and cost of the permitting application review and approval process, which is intended to decrease customer cancellation rates and expand solar energy development and solar job growth nationwide.
“Over the past decade, NREL research has shown that while the cost of PV modules and other hardware has declined, non-hardware ‘soft’ costs remain relatively constant. The SolarAPP software will help address key soft cost challenges by providing both AHJs and installers a standardized online portal to complete and manage permitting and inspection processes,” said Kristen Ardani, Solar Analysis Sub-program Lead at NREL. “We look forward to serving the critical role of an independent, third-party developer of the SolarAPP portal.”
The SolarAPP Campaign seeks a fundamental reshaping of solar permitting at the federal, state and local levels. The goal is to allow most routine rooftop solar projects to receive instantaneous approval and efficient inspections while enhancing safety and reliability.
The SolarAPP platform will build on existing software capabilities at NREL to do the following:
Provide a flexible, web-based solar permitting tool for residential systems. Encourage the standardization of permitting processes, while allowing for some flexibility to produce applications that meet the specific requirements of AHJs.
Evaluate applications and design plans for safety certification and code compliance. Offer opportunities to incorporate energy storage and expand to other market segments, such as solar thermal and commercial systems.
The SolarAPP initiative builds on previous and existing programs to reduce soft costs, including the SolSmart program that provides designation and no-cost technical assistance for local governments to open up solar markets.
“The SolarAPP platform will help local governments reduce administrative burdens and make it faster and easier for customers to go solar,” said Andrea Luecke, president and executive director at The Solar Foundation. “At a time when accelerating the deployment of solar and storage has never been more urgent, this platform fills a critical market need.”
The partners working with NREL, SEIA and the Solar Foundation on the SolarAPP software include installation companies as well as key nonprofit organizations and trade associations. Additional partners include the California Solar & Storage Association, Institute for Building Technology and Safety (IBTS), SunPower, Sunrun, Tesla and Vivint Solar.
“Inefficient permitting can cause frustration and added costs for Americans who just want to go solar,” said Abigail Ross Hopper, president and CEO of SEIA. “A streamlined, easy-to-use solution such as SolarAPP can cut down on burdensome applications and connect solar projects to the grid faster. A more reliable permitting experience will help both inspectors and solar customers save time and money without sacrificing safety or quality. We’re thrilled to see SolarAPP get financial backing from the Department of Energy and will continue to actively support this important initiative.”
While the cost of residential solar installations has decreased more than 70% over the last 10 years, costs are still much higher in the United States than in other mature markets, largely due to non-hardware “soft costs.” The direct and indirect costs of permitting, inspection and interconnection, including efforts spent acquiring customers who cancel before a permit is issued, can add about $1 per watt, or $7,000, to the cost of a typical residential system.
Nationwide, there are over 20,000 AHJs with distinct permitting and inspection requirements, application costs and approval times. The SolarAPP platform will provide a streamlined process that will increase efficiency and reduce the time and cost of a solar permit, leading in turn to lower cancellation rates.
“Sunrun is proud to partner with NREL, The Solar Foundation, the Solar Energy Industries Association and other industry partners to support the development of the Solar Automated Permit Software for distributed PV and battery storage,” said Alex McDonough, VP of public policy at Sunrun. “This resource will help companies like Sunrun cut red tape and reduce their costs to deliver significantly more affordable, reliable, local clean energy solutions to communities around the country.”
This platform will also assist local governments, which face budget constraints and growing workloads to keep up with the accelerated pace of solar energy development.
“The SolarAPP will make it faster and easier for homeowners to get clean, affordable solar energy and Vivint Solar is pleased to partner with NREL, The Solar Foundation, SEIA and other industry advocates to develop this technology,” said David Bywater, CEO of Vivint Solar.
News item from SEIA
0 notes
robmbobby · 6 years
Text
Musings: Moving or Going into a New Service Area, There is More to It Than Just…
Originally posted 2014-08-08 09:00:50.
For this week’s Guest Post Friday here at Construction Law Musings, we would like to welcome back (again) Sean Lintow Sr. (@The_HTRC) Sean has over 20 years in the construction and project management fields. As many know he pulled up stakes and moved to the State of Illinois almost a year ago where he still focuses on the “green” / energy efficiency markets by helping builders & trade professionals to improve their methods not only locally but nationally. Currently he is RESNET Rater, AEE CEA (Certified Energy Auditor), ENERGY STAR partner & verifier, EPA Indoor airPLUS verifier, Level 2 Infrared Thermographer, Volunteer Energy Rater for Habitat for Humanity, and Builders Challenge Partner & Verifier.
I would like to thank Chris for inviting me back as a guest poster. One item that struck a bell with me lately was his recent post for contractors considering work in another state is to check that states contractor licensing laws. Part of me was just saying – ahh if it were just that simple… With that in mind, here are some additional thoughts of mine along with advice picked up and given to others considering a move to greener pastures in another state, another town or maybe even taking that sweet little project outside of your current area that seems too good to pass up.
Licensing:
Yep this is a no-brainer – but unfortunately, as I pointed out in a 2012 piece it isn’t always that simple as in some cases the state may not require licensing and instead leave it to the towns which can be real fun to figure out. How long will it take to obtain? Ahh, but what about other licenses that a township may require? Working on a pre-78 house – is the state a self-managed one or is your current EPA certificate and training good enough? (Living in a self-managed state but working on an Indian Reservation? Well you will need to be EPA certified) Does the area require a specialty Storm Water Certificate or???
Codes & other Regulations:
While many states do adopt codes on a statewide basis, many allow the local jurisdictions to modify them or adopt tougher provisions. I would recommend calling the AHJ or Authority Having Jurisdiction to find out not only what code they are using but if there are any special amendments to be aware of. Don’t forget to ask about the cost, any special filing requirements, and what inspections are required / how to order. The ICC has a good list that they continuously update available – here.
One of the other big issues that I have seen throw many for a loop is someone deciding to take on a vacation home near a coast, river or other area and them running into additional requirements dealing with drainage, impervious surface area, geotechnical measures, &/or storm water management. Not only does this add to engineering costs, lengthy review processes but also additional site measures needing to be taken. Heh on the flip side, do you think those stories on dealing with hysterical err historical commissions are overblown – well in some cases they are, others…
Climate Zone & other Environmental Factors:
Some of the biggest issues I have seen are caused by great contractors who simply assumed that what works great where they are will work everywhere. From increased humidity and moisture concerns to wind and snow loads issues can change dramatically in the space of just a few miles. In many cases the Building Department will be a good guide or even sites like mine.
Taxes:
Some states like Arizona require you to collect taxes on the entire project while other localities may have a local tax license you must buy. If you happen to work (or have moved to) in a different state be prepared to keep two sets of books and possibly creating a new company. For this I recommend you talk to not only your accountant but also a lawyer.
For those that maybe staying in a motel for a project, don’t forget to find out what the full price is as some towns have special taxes which can really add up. For those that are moving, make sure you consider checking into what property & auto taxes are.
Sub-Contractors:
I got to say one of the biggest issues I have had in the past is finding new trade partners (aka sub-contractors.) Be forewarned this can take time & it would be worth checking in with some of the local associations – whether it is NARI, NAHB, AGC, etc… You may also wish to talk with their government / regulatory liaison and others as they can help you with many of the items above. One last group to consider – the local Chamber of Commerce.
With that I would like to once again thank Chris for the opportunity to post once again. If you are reading this because you wish to pull up stakes or simply expand your area, I wish you the best of luck.
As always, Sean and I welcome your comments below.  Please subscribe to keep up with this and other Guest Post Fridays at Construction Law Musings.
© Construction Law Musings- Richmond, VA is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 license.
Related Musings:
How Do You Get to the Five Year Mark? Some Practical Advice
Energy Codes, Compliance Deadlines & Keeping up to Date
How (NOT) to Work With the EPA and Your State…
CALGreen. It’s finally here. Now what?
Top Ten Incentives for Green Construction
0 notes
jobdxb · 6 years
Link
Job Responsibilities:
To review and understand all inquiry related information, Customer requirements and project documents (Drawings, Specifications, BOQ, etc) To communicating with Manufactures and Suppliers to acquire the required technical and commercial details and support to prepare accurate proper costing and quotations. To do fast and accurate design, BOQ generating and cost sheets preparations for Fire Alarm, Emergency lighting, Public Address and Voice Alarm, CCTV, Access Control, Structured cabling, Lighting control, Gate Barriers, Intercom System, Master Clock, BMS, etc. in compliance with project documents and AHJ requirements. To preparation Technical-Commercial Proposals for Life safety and ELV systems like but not limited to Fire Alarm, Emergency lighting, Public Address and Voice Alarm, CCTV, Access Control, Structured cabling, Lighting control, Gate Barriers, Intercom System, Master Clock, BMS, etc. in compliance with project documents and AHJ requirements.
Minimum requirements Having 3-5 years of experience in Estimation / Design (Life safety and ELV systems) Holding Engineering Degree – Electrical/Electronics.
0 notes
akanksharana · 3 years
Text
How about there was a solar store which could provide all the services under one roof with express delivery…sounds like a dream, right? Well, not anymore!
WattMonk, which has proven to be USA’s everyday solar store, provides services in a package and even the individual service. Their USP is the quality-assurance factor and the express deliveries which makes them stand-out.
The 24/7 assistance (yes, you read that right 24/7) to their clients has taken the company to the level where they now are one of the companies, catering 25 MW of solar projects EVERY month.
That is HUGE!
Tumblr media
Let’s have a look at what all solar solutions do they provide from Prelim Design to As-Built Drawings. Now, the first challenge is to find the right spot for the solar panels to be installed. There's a possibility that where the sun rays' hit the most on your site, might not be the best place to install panels, so how exactly does WattMonk counter these problems?
The Prelim Design, which uncovers the layout of the house depicting how the sun rays will look on your space. WattMonk helps to show cast a layout of the respective residential or commercial site with solar modules placed on the best roof angles to see how the solar array will look on your space, taking into consideration obstructions such as attic vents, exhaust pipes, chimneys, etc.
Apart from specializing in catering U.S’s AHJ-compliant solar PV designs and being capable of delivering Prelim design in just 60 min* of design requests. They help the customers in grasping a far better understanding of the prices and outcome of owning a solar PV system. Solution to the next challenge, the Survey of the space is:
WattMonk provides a suggestive application to all its clients so as to assist them in making sure every bit of an essential information is being check listed. This app helps in conducting surveys by providing customized survey templates with ease of conducting survey without repetitive site visits and not just this but with zero paperwork. It equips your team to survey each of the facilities with utmost precaution and preciseness. It is a single platform to collate all of your important documents in one place with no hassle.
The detailed Survey checklist ensures that none of the clients miss any essential information, saving their time as well as efforts of going to-and-fro to the plant.
Tumblr media
Skipping the process of going to-and-fro to the client, you can now share the Solar Permit Design through the same application.
 Permit plan, a customized document for customers as per local Authority Having Jurisdiction (AHJ). Solar permit design includes detailed plans for individual Solar Projects.
 This solar permit design not only can be submitted to their city for permit approval but also can be used to guide contractors during solar installations. 
 WattMonk has worked on 15000+ designs for AHJ designs hence, provides standardized survey with success rate of 98.2%. It includes detailed plans for individual Solar Projects. This solar permit design not only can be submitted to the city for permit approval but also can be used to guide contractors during solar installations.
Isn’t that a relief?
The crucial and critical part, i.e., PE Stamping:
WattMonk facilitates PE stamping for all residential & Commercial projects and both structural and electrical stamping, to confirm all drawings and designs are as per AJH, so that our clients do not face any hurdle and can run their plan smoothly.
With structural engineer’s review of all Pictures of the Project, ensures that it is safe for the owner as well as the community.
When a PE backs your project, the state will easily recognize its legitimacy and provides approval. When you place your trust in a PE, they become liable for your project’s integrity.
 Last but not the least, As-Built Drawing:
The as-built drawings show how the system was actually installed and it showcases any changes made to the design during installation. 
To have the most recent drawings, WattMonk provides the As-Built drawings services to its customers in express delivery.
What’s the wait for?
Visit WattMonk’s website www.wattmonk.com or reach out to them at: Write at: [email protected] Call at: (973) 609-9241 
0 notes