Tumgik
#revitmepcoordination
hitechbimservices · 3 years
Text
MEP means referring to mechanical, electrical, and plumbing systems utilized in the building structure. Improving the performance of the MEP system impacts the overall performance and operational efficiency of the building. It is thus important to ensure that the MEP designs are efficient so that the building development project is not affected adversely. Here are the 3 critical steps an MEP contractor or an engineer should follow. https://bit.ly/3v8GS5M
0 notes
hitechbimservices · 3 years
Text
Clash-free MEP BIM Modeling for Plant Room
Rework and material waste contributes up to 7.25% to 35% of total project cost and also increases construction time. A clash-free 3D BIM model helps reduce delays, material waste, and costly construction rework.
Tumblr media
To meet the clients' requirements, BIM consultant experts at Hitech BIM Services provided accurate MEP 3D modeling and clash detection for a Plant Room in Europe helped detect clashes and resolve them leading to informed decision-making as well as cost-saving due to first-time-right deliverables.
To discuss your detailed project requirements contact our MEP clash resolution experts at [email protected]
0 notes
hitechbimservices · 3 years
Text
MEP 3D models and MEP coordination drawings developed in Autodesk Revit helps engineers and architects to plan the design efficiently. It helps in determining the accuracy of the designs and models to ensure a seamless construction process. Using clash detection software like Navisworks ensures that elements of architectural, structural, and MEP disciplines do not clash with each other. Read more >> https://bit.ly/2MzliH4
0 notes